76 research outputs found

    Emittance growth mechanisms in the Tevatron beams

    Full text link
    In this article we present results of emittance growth measurements in the Tevatron beams. Several mechanisms leading to transverse and longitudinal diffusions are analyzed and their contributions estimated.Comment: 7 p

    STATCOM evaluation in electrified railway using V/V and Scott power transformers

    Get PDF
    Rail transport has always been one of the greatest economic boosters of several world nations, allowing the freight and passenger transport. In addition, it is the most secure and economic land transportation mode. From the energetic perspective, the electric locomotives emerge as one of the most efficient land transportation mode, as well as allow a more sustainable development. However, when an electric locomotive is connected to the three-phase power grid, power quality (PQ) deterioration arise, leading to the distortion and unbalance of the three-phase power grid currents and voltages which imply higher operational costs, raising economic and functional issues. In order to overcome the PQ deterioration phenomena, several solutions based power electronics technology have been studied and developed. These solutions vary in terms of control, functionality, implementation costs and complexity. One of the existing solutions is a static synchronous compensator (STATCOM), which compensates the three-phase currents imbalance and harmonics. In this paper, a comprehensive review of the electrified railway systems is carried out, identifying the electric PQ phenomena which may appear due to the non-linear dynamic traction loads. Following this topic, a computational simulation of the STATCOM is presented, making analysis of its behavior regarding the PQ improvement in electrified railway systems. Two case studies are presented: (i) a traction power system fed with V/V power transformer; (ii) a traction power system fed with Scott power transformer.This work has been supported by FCT – Fundação para a Ciência e Tecnologia with-in the Project Scope: UID/CEC/00319/2019. This work has been supported by the FCT Project QUALITY4POWER PTDC/EEI-EEE/28813/2017, and by the FCT Project DAIPESEV PTDC/EEI-EEE/30382/2017. Mr. Luis A. M. Barros is supported by the doctoral scholarship PD/BD/143006/2018 granted by the Portuguese FCT foundation. Mr. Mohamed Tanta was supported by FCT PhD grant with a reference PD/BD/127815/2016

    Beam instrumentation for the Tevatron Collider

    Full text link
    The Tevatron in Collider Run II (2001-present) is operating with six times more bunches and many times higher beam intensities and luminosities than in Run I (1992-1995). Beam diagnostics were crucial for the machine start-up and the never-ending luminosity upgrade campaign. We present the overall picture of the Tevatron diagnostics development for Run II, outline machine needs for new instrumentation, present several notable examples that led to Tevatron performance improvements, and discuss the lessons for future colliders
    corecore