21 research outputs found
μ² κ·Όμ½ν¬λ¦¬νΈ ꡬ쑰물μ λ°ν ν΄μ²΄λ₯Ό μν μλν μ§μλ² μ΄μ€ μμ€ν
Thesis (doctoral)--μμΈλνκ΅ λνμ :ν λͺ©κ³΅νκ³Ό,1995.Docto
λ¨κ·Ή νΉμ£ μ§μ¬ λ§λ¦¬μμλ§ μ‘°νλ μ μκ΅°μ§μμμ μμμΌλ₯μ μ κΈ°νμ μν
Thesis (doctoral)--μμΈλνκ΅ λνμ :ν΄μνκ³Ό,1998.Docto
ν¨κ³Όμ μ μ± κ΄λ¦¬λ₯Ό μν νΉμ νκ°μ λ λ° λ°©λ²λ‘ κ°μ λ°©μ
λ
ΈνΈ : 촬μμ₯μ: λνλ―Όκ΅ μμΈ κ΅λ¦½μ€μμλ£μκ΄λ ¨λ΄μ©: κ΅λ¦½μ€μμλ£μ λμ±μ
Analyzing cost factors in contracting outin service delivery: focusing on the perception of public managers in the Seoul metropolitan area
λ³Έ λ
Όλ¬Έμ λ§μ μ°κ΅¬μλ€μ΄ μ£Όμ₯νλ λ―Όκ°μν λΉμ©μ μ κ°ν¨κ³Όκ° μκ°λ³΄λ€ κ³Όμ₯λμμ κ°λ₯μ±μ΄ μλ€κ³ νλ¨νμ¬ λΉμ©μ λ¨μν μμ°λΉμ©μ κ΅νλ κ²μ΄ μλλΌ κ³μ½λΉμ©κ³Ό κ°λ
λΉμ©μΌλ‘ μΈλΆννμ κ²½μ° μ€νλ € λ λ§μ κ³μ½λΉμ©κ³Ό κ°λ
λΉμ©μ΄ μ¦κ°λ¨μΌλ‘μ¨ λ―Όκ°μν κ³ μ μ μ₯μ μΈ λΉμ©μ κ°μ΄λΌλ ν¨κ³Όλ₯Ό κ°μ§κ³ μ€μ§ λͺ»ν μλ μλ€λ μ κ³Ό μ΄λ¬ν μ΄μ λ‘ μΈνμ¬ κ³μ½λΉμ©κ³Ό κ°λ
λΉμ©μ μ€μ΄κΈ° μν΄μλ μ§μμ μΈ κ΄λ¦¬μ λ
Έλ ₯μ΄ νμνλ€λ μ μ μ§μ νκ³ μλ€. μ΄λ λ―Όκ°μνμ΄ μ€μ μλνλ λΉμ©μ κ°μ΄λΌλ μ μ±
λͺ©νλ₯Ό λ¬μ±νμ§ λͺ» ν μλ μμΌλ©°, μ°λ¦¬λλΌ μ§λ°©μμΉλ¨μ²΄μ μ λμ Β·νμ μ νΉμμ±μ λ°λΌ κ·Έμ μ μ©κ³Ό μ±κ³΅μ¬λΆκ° λ¬λΌμ§ μ μμμ λνλ΄λ κ²μ΄λ€. λ³Έ μ°κ΅¬μ κ²°κ³Όλ‘ λ³Ό λ, μ°λ¦¬λλΌμ λ―Όκ°μν νκ²½μ΄ κ²½μμ κ°μ‘°νλ 곡곡μ νλ‘ μ μ΄λ‘ λ³΄λ€ μ λ’°λ₯Ό κ°μ‘°νλ κ±°λλΉμ©μ μ΄λ‘ μ΄ λ μ ν©ν μλ μμΌλ©°, λ―Όκ°μ
체μμ κ΄κ³μ μ λ’°μ μ€μμ±μ μΈμνκ³ , μ΄μ λν μ κ·Ήμ μΈ κ³ λ €κ° νμνλ€κ³ 보μ¬μ§λ€. μ΄λ¬ν 곡곡μλΉμ€μ λ―Όκ°μν λΉμ©κ³Ό κ·Έ μν₯μμΈμ λν λ
Όμμ μ€μ¦μ λΆμμ ν₯ν μΆμ§λ λ―Όκ°μν μ¬μ
μ μ±κ³΅μ μν ν¨μλ₯Ό μ 곡νλ ννΈ μ μ°¨ 보νΈν λκ³ μλ μ§λ°©μμΉλ¨μ²΄μ λ―Όκ°μνμ¬μ
μ λνμ¬ λ§μ μ΄λ‘ μ Β·μ€μ§μ ν¨μλ₯Ό μ 곡ν μ μμ κ²μ΄λ€. This study analyzes cost factors in contracting out in the Seoul Metropolitan Area. Many previous studies have argued that there is a strong cost-saving effect when contracting-out. In this article, we employ three factors in analyzing the costs in contracting-out (production costs, administrative costs, and monitoring costs). The cost savings in contracting out were not as high as we expected. Without constant managerial monitoring and investigation in the contracting-out process, administrative costs and monitoring costs are higher than production costs when contracting out. According to the results of interviews and statistical analysis, contracting out was found not to be a single solution for cost-saving in service delivery in the administrative and political environment in Korea and should be considered cautiously for in local Korean governments. The results also show that trust and the relationship between local governments and private companies are key factors in contracting out