2 research outputs found

    New constructions of wire ropes for the industry

    Get PDF
    The wire ropes are used in different industrial fields. Their construction depends on the type of equipment and its purpose. Most frequently we meet with ropes at different transport and hoisting equipments and very freqently in the civil industry. For users characteristics are important which must meet requirements of the individual regulations and standards of the selection of wire ropes for the concrete equipment. The most important is the factor of safety being safeguarded by the corresponding bearing capacity of the rope. The service life of rope is interesting for the user, too, because of having an influence on the economy of the equipment on which the rope is working. These problems are solved by the grant project at our department . We are aimed at questions of the optimization of construction of wire rope with regard to their geometric construction and service life. Respectively on the basis of elaborated computer software eightstrand ropes of parallel construction were disigned and produced at the Drôtov ň a Hlohovec. The results of the fatigue tests confirmed their better qualitative properties, longer service life and economy advantages for users, too. Their using is possible and suitable on the new hoisting eguipment on the surface, in the undeground and in the hole drilling industry. By the application of the computer technique is also possible to improve the parametres of six-strands` construction of rope, the classic and parallel constructions, especially their bearing capacity. This fact follows from the knowledge that for the production of rope we use calculated diameters of wires, which secure better utilization of the metal cross-section of the wire ropes

    Simulation as Logistic Support to Handling in the Warehouse: Case Study

    No full text
    Manipulation processes represent an important part of the material management in a company. These processes run inside a company and represent an integrated chain of material flow. The current situation regarding the material manipulation is evaluated using the manipulation indicators which may serve as the basis for manipulation system rationalisation designs. The present case study is focused on the determination of an appropriate number of forklift trucks in a given operation and consists of three sections. The introductory section deals with the evaluation of forklift activities while applying the selected analysis and the selected indicators. Analysis results subsequently served as a basis for the calculation. The calculated number of trucks must be properly verified; the verification should be focused on whether the given number of forklifts is actually sufficient for the performance of the current activities. The activities were verified while applying the simulation. A simulation model was created using the Technomatix Plan Simulation software
    corecore