Requirements Prioritization Based on Benefit and Cost Prediction: An Agenda for Future Research
In early phases of the software cycle, requirements
prioritization necessarily relies on the specified
requirements and on predictions of benefit and cost of
individual requirements. This paper presents results of
a systematic review of literature, which investigates
how existing methods approach the problem of
requirements prioritization based on benefit and cost.
From this review, it derives a set of under-researched
issues which warrant future efforts and sketches an
agenda for future research in this area
Evaluation of a risk assessment system for heritage railway earthworks
There are currently over 100 heritage railways in the UK carrying 6.8 million passengers on 15 million passenger journeys and contributing an estimated ÂŁ579 million to the UK economy. Many of these lines include significant earthworks, which present a considerable risk to their safe operation. In the last decade there have been major slips at several heritage railways causing major disruption to operations and a serious threat to business continuity.
This research describes the application of a risk assessment system based on that used by Network Rail but specifically adapted for heritage railway conditions. Adaptations include significant alterations to the consequence categories used in prioritization of earthwork issues and a simple low-cost method of implementation based on paper forms and Excel spreadsheets.
Use of the system on two heritage railways, the Boâness and Kinneil Railway and the Strathspey Railway is evaluated by means of discussion with railway engineering staff and civil engineering volunteers.
It is concluded that whilst the system represents a realistic and useful approach to management of earthwork assets, the system could not be used by heritage railway volunteer staff without targeted training. Such training, however, would be straightforward to provide, perhaps under the auspices of the Heritage Railway Association
Requirements Prioritization Based on Benefit and Cost Prediction: A Method Classification Framework
In early phases of the software development process, requirements prioritization necessarily relies on the specified requirements and on predictions of benefit and cost of individual requirements. This paper induces a conceptual model of requirements prioritization based on benefit and cost. For this purpose, it uses Grounded Theory. We provide a detailed account of the procedures and rationale of (i) how we obtained our results and (ii) how we used them to form the basis for a framework for classifying requirements prioritization methods
Technical Debt Prioritization: State of the Art. A Systematic Literature Review
Background. Software companies need to manage and refactor Technical Debt
issues. Therefore, it is necessary to understand if and when refactoring
Technical Debt should be prioritized with respect to developing features or
fixing bugs. Objective. The goal of this study is to investigate the existing
body of knowledge in software engineering to understand what Technical Debt
prioritization approaches have been proposed in research and industry. Method.
We conducted a Systematic Literature Review among 384 unique papers published
until 2018, following a consolidated methodology applied in Software
Engineering. We included 38 primary studies. Results. Different approaches have
been proposed for Technical Debt prioritization, all having different goals and
optimizing on different criteria. The proposed measures capture only a small
part of the plethora of factors used to prioritize Technical Debt qualitatively
in practice. We report an impact map of such factors. However, there is a lack
of empirical and validated set of tools. Conclusion. We observed that technical
Debt prioritization research is preliminary and there is no consensus on what
are the important factors and how to measure them. Consequently, we cannot
consider current research conclusive and in this paper, we outline different
directions for necessary future investigations
How Do Real Options Concepts Fit in Agile Requirements Engineering?
Agile requirements engineering is driven by creating business value for the client and heavily involves the client in decision-making under uncertainty. Real option thinking seems to be suitable in supporting the clientâs decision making process at inter-iteration time. This paper investigates the fit between real option thinking and agile requirements engineering. We first look into previously published experiences in the agile software engineering literature to identify (i) âexperience clustersâ suggesting the ways in which real option concepts fit into the agile requirements process and (ii) âexperience gapsâ and under-researched agile requirements decision-making topics which require further empirical studies. Furthermore, we conducted a cross-case study in eight agile development organizations and interviewed 11 practitioners about their decision-making process. The results suggest that options are almost always identified, reasoned about and acted upon. They are not expressed in quantitative terms, however, they are instead explicitly or implicitly taken\ud
into account during the decision-making process at interiteration time
The Failed Promise of User Fees: Empirical Evidence from the United States Patent and Trademark Office
In an attempt to shed light on the impact of user-fee financing structures on the behavior of administrative agencies, we explore the relationship between the funding structure of the Patent and Trademark Office (PTO) and its examination practices. We suggest that the PTOâs reliance on prior grantees to subsidize current applicants exposes the Agency to a risk that its obligatory costs will surpass incoming fee collections. When such risks materialize, we hypothesize, and thereafter document, that the PTO will restore financial balance by extending preferential examination treatmentâi.e., higher granting propensities and/or shorter wait timesâto some technologies over others
The Failed Promise of User Fees: Empirical Evidence from the United States Patent and Trademark Office
In an attempt to shed light on the impact of user-fee financing structures on the behavior of administrative agencies, we explore the relationship between the funding structure of the Patent and Trademark Office (PTO) and its examination practices. We suggest that the PTOâs reliance on prior grantees to subsidize current applicants exposes the Agency to a risk that its obligatory costs will surpass incoming fee collections. When such risks materialize, we hypothesize, and thereafter document, that the PTO will restore financial balance by extending preferential examination treatmentâi.e., higher granting propensities and/or shorter wait timesâto some technologies over others