7 research outputs found

    A Fast-Pivoting Algorithm for Whittle's Restless Bandit Index

    Get PDF
    This article belongs to the Special Issue Applied ProbabilityThe Whittle index for restless bandits (two-action semi-Markov decision processes) provides an intuitively appealing optimal policy for controlling a single generic project that can be active (engaged) or passive (rested) at each decision epoch, and which can change state while passive. It further provides a practical heuristic priority-index policy for the computationally intractable multi-armed restless bandit problem, which has been widely applied over the last three decades in multifarious settings, yet mostly restricted to project models with a one-dimensional state. This is due in part to the difficulty of establishing indexability (existence of the index) and of computing the index for projects with large state spaces. This paper draws on the author’s prior results on sufficient indexability conditions and an adaptive-greedy algorithmic scheme for restless bandits to obtain a new fast-pivoting algorithm that computes the n Whittle index values of an n-state restless bandit by performing, after an initialization stage, n steps that entail (2/3)n3+O(n2) arithmetic operations. This algorithm also draws on the parametric simplex method, and is based on elucidating the pattern of parametric simplex tableaux, which allows to exploit special structure to substantially simplify and reduce the complexity of simplex pivoting steps. A numerical study demonstrates substantial runtime speed-ups versus alternative algorithms.This research has been developed over a number of years, and has been funded by the Spanish Government under grants MEC MTM2004-02334 and PID2019-109196GB-I00/AEI/10.13039/501100011033. This research was also funded in part by the Comunidad de Madrid in the setting of the multi-year agreement with Universidad Carlos III de Madrid within the line of activity "Excelencia para el Profesorado Universitario", in the framework of the V Regional Plan of Scientific Research and Technological Innovation 2016-2020

    Fast two-stage computation of an index policy for multi-armed bandits with setup delays

    Get PDF
    We consider the multi-armed bandit problem with penalties for switching that include setup delays and costs, extending the former results of the author for the special case with no switching delays. A priority index for projects with setup delays that characterizes, in part, optimal policies was introduced by Asawa and Teneketzis in 1996, yet without giving a means of computing it. We present a fast two-stage index computing method, which computes the continuation index (which applies when the project has been set up) in a first stage and certain extra quantities with cubic (arithmetic-operation) complexity in the number of project states and then computes the switching index (which applies when the project is not set up), in a second stage, with quadratic complexity. The approach is based on new methodological advances on restless bandit indexation, which are introduced and deployed herein, being motivated by the limitations of previous results, exploiting the fact that the aforementioned index is the Whittle index of the project in its restless reformulation. A numerical study demonstrates substantial runtime speed-ups of the new two-stage index algorithm versus a general one-stage Whittle index algorithm. The study further gives evidence that, in a multi-project setting, the index policy is consistently nearly optimal

    Opportunistic Scheduling as Restless Bandits

    No full text
    corecore