    Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times

    Get PDF
    This work considers a scheduling problem identified in a factory producing customised Heating, Ventilation and Air Conditioning (HVAC) equipment. More specifically, the metal folding section is modelled as unrelated parallel machines with machine eligibility and sequence-dependent setup times. The objective under consideration is the minimisation of the total tardiness. The problem is known to be NP-hard so approximate methods are needed to solve real-size instances. In order to embed the scheduling procedure into a decision support system providing high-quality solutions in nearly real time, the goal of this paper is to develop fast, efficient constructive heuristics for the problem. Due to the lack of methods for this specific problem, some existing heuristics and one metaheuristic are selected from related problems and adapted. In addition, a set of heuristics with novel repair and improvement phases are proposed. The performance of the methods adapted and the proposals are compared with the optimal/approximate solutions obtained by a solver for an MILP in two sets of instances with small and medium sizes. Additionally, big-size instances (representing more realistic cases for our company) have been solved using the proposed constructive heuristics, providing efficient solutions in negligible computational times. Even if the adaptation of heuristics performs reasonably well, these are outperformed by the new heuristic proposed in this paper. In addition, when the new heuristic is embedded in the metaheuristic adapted from a related the problem, the results obtained are excellent in terms of the quality of the solution, even if the computational effort is somewhat higher.Ministerio de Ciencia en Innovación. “PROMISE

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures

    Get PDF
    Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous scientific contributions have been produced on this area over the last decades, the wide extension of the problems covered and the lack of a unified approach have lead to a situation where the state of the art in the field is unclear, which in turn hinders new research and makes translating the scientific knowledge into practice difficult. In this paper we propose a unified notation for assembly scheduling models that encompass all concurrent-type scheduling problems. Using this notation, the existing contributions are reviewed and classified into a single framework, so a comprehensive, unified picture of the field is obtained. In addition, a number of conclusions regarding the state of the art in the topic are presented, as well as some opportunities for future research.Ministerio de Ciencia e Innovación español DPI2016-80750-

    Approximate Algorithms for the Combined arrival-Departure Aircraft Sequencing and Reactive Scheduling Problems on Multiple Runways

    Get PDF
    The problem addressed in this dissertation is the Aircraft Sequencing Problem (ASP) in which a schedule must be developed to determine the assignment of each aircraft to a runway, the appropriate sequence of aircraft on each runway, and their departing or landing times. The dissertation examines the ASP over multiple runways, under mixed mode operations with the objective of minimizing the total weighted tardiness of aircraft landings and departures simultaneously. To prevent the dangers associated with wake-vortex effects, separation times enforced by Aviation Administrations (e.g., FAA) are considered, adding another level of complexity given that such times are sequence-dependent. Due to the problem being NP-hard, it is computationally difficult to solve large scale instances in a reasonable amount of time. Therefore, three greedy algorithms, namely the Adapted Apparent Tardiness Cost with Separation and Ready Times (AATCSR), the Earliest Ready Time (ERT) and the Fast Priority Index (FPI) are proposed. Moreover, metaheuristics including Simulated Annealing (SA) and the Metaheuristic for Randomized Priority Search (Meta-RaPS) are introduced to improve solutions initially constructed by the proposed greedy algorithms. The performance (solution quality and computational time) of the various algorithms is compared to the optimal solutions and to each other. The dissertation also addresses the Aircraft Reactive Scheduling Problem (ARSP) as air traffic systems frequently encounter various disruptions due to unexpected events such as inclement weather, aircraft failures or personnel shortages rendering the initial plan suboptimal or even obsolete in some cases. This research considers disruptions including the arrival of new aircraft, flight cancellations and aircraft delays. ARSP is formulated as a multi-objective optimization problem in which both the schedule\u27s quality and stability are of interest. The objectives consist of the total weighted start times (solution quality), total weighted start time deviation, and total weighted runway deviation (instability measures). Repair and complete regeneration approximate algorithms are developed for each type of disruptive events. The algorithms are tested against difficult benchmark problems and the solutions are compared to optimal solutions in terms of solution quality, schedule stability and computational time

    Comparative simulation study of production scheduling in the hybrid and the parallel flow

    Get PDF
    Scheduling is one of the most important decisions in production control. An approach is proposed for supporting users to solve scheduling problems, by choosing the combination of physical manufacturing system configuration and the material handling system settings. The approach considers two alternative manufacturing scheduling configurations in a two stage product oriented manufacturing system, exploring the hybrid flow shop (HFS) and the parallel flow shop (PFS) environments. For illustrating the application of the proposed approach an industrial case from the automotive components industry is studied. The main aim of this research to compare results of study of production scheduling in the hybrid and the parallel flow, taking into account the makespan minimization criterion. Thus the HFS and the PFS performance is compared and analyzed, mainly in terms of the makespan, as the transportation times vary. The study shows that the performance HFS is clearly better when the work stations' processing times are unbalanced, either in nature or as a consequence of the addition of transport times just to one of the work station processing time but loses advantage, becoming worse than the performance of the PFS configuration when the work stations' processing times are balanced, either in nature or as a consequence of the addition of transport times added on the work stations' processing times. This means that physical layout configurations along with the way transport time are including the work stations' processing times should be carefully taken into consideration due to its influence on the performance reached by both HFS and PFS configurations.This work was supported by National Funds through FCT "Fundacao para a Ciencia e a Tecnologia" under the program: PEst2015-2020, ref. UID/CEC/00319/2013.info:eu-repo/semantics/publishedVersio

    Guided genetic algorithm for solving unrelated parallel machine scheduling problem with additional resources

    Get PDF
    This paper solved the unrelated parallel machine scheduling with additional resources (UPMR) problem. The processing time and the number of required resources for each job rely on the machine that does the processing. Each job j needed units of resources (rjm) during its time of processing on a machine m. These additional resources are limited, and this made the UPMR a difficult problem to solve. In this study, the maximum completion time of jobs makespan must be minimized. Here, we proposed genetic algorithm (GA) to solve the UPMR problem because of the robustness and the success of GA in solving many optimization problems. An enhancement of GA was also proposed in this work. Generally, the experiment involves tuning the parameters of GA. Additionally, an appropriate selection of GA operators was also experimented. The guide genetic algorithm (GGA) is not used to solve the unspecified dynamic UPMR. Besides, the utilization of parameters tuning and operators gave a balance between exploration and exploitation and thus help the search escape the local optimum. Results show that the GGA outperforms the simple genetic algorithm (SGA), but it still didn't match the results in the literature. On the other hand, GGA significantly outperforms all methods in terms of CPU time