24,865 research outputs found
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
A reusable iterative optimization software library to solve combinatorial problems with approximate reasoning
Real world combinatorial optimization problems such as scheduling are
typically too complex to solve with exact methods. Additionally, the problems
often have to observe vaguely specified constraints of different importance,
the available data may be uncertain, and compromises between antagonistic
criteria may be necessary. We present a combination of approximate reasoning
based constraints and iterative optimization based heuristics that help to
model and solve such problems in a framework of C++ software libraries called
StarFLIP++. While initially developed to schedule continuous caster units in
steel plants, we present in this paper results from reusing the library
components in a shift scheduling system for the workforce of an industrial
production plant.Comment: 33 pages, 9 figures; for a project overview see
http://www.dbai.tuwien.ac.at/proj/StarFLIP
AI and OR in management of operations: history and trends
The last decade has seen a considerable growth in the use of Artificial Intelligence (AI) for operations management with the aim of finding solutions to problems that are increasing in complexity and scale. This paper begins by setting the context for the survey through a historical perspective of OR and AI. An extensive survey of applications of AI techniques for operations management, covering a total of over 1200 papers published from 1995 to 2004 is then presented. The survey utilizes Elsevier's ScienceDirect database as a source. Hence, the survey may not cover all the relevant journals but includes a sufficiently wide range of publications to make it representative of the research in the field. The papers are categorized into four areas of operations management: (a) design, (b) scheduling, (c) process planning and control and (d) quality, maintenance and fault diagnosis. Each of the four areas is categorized in terms of the AI techniques used: genetic algorithms, case-based reasoning, knowledge-based systems, fuzzy logic and hybrid techniques. The trends over the last decade are identified, discussed with respect to expected trends and directions for future work suggested
Intelligent systems in manufacturing: current developments and future prospects
Global competition and rapidly changing customer requirements are demanding increasing changes in manufacturing environments. Enterprises are required to constantly redesign their products and continuously reconfigure their manufacturing systems. Traditional approaches to manufacturing systems do not fully satisfy this new situation. Many authors have proposed that artificial intelligence will bring the flexibility and efficiency needed by manufacturing systems. This paper is a review of artificial intelligence techniques used in manufacturing systems. The paper first defines the components of a simplified intelligent manufacturing systems (IMS), the different Artificial Intelligence (AI) techniques to be considered and then shows how these AI techniques are used for the components of IMS
Project scheduling under undertainty – survey and research potentials.
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;
Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: a dynamic forward approach
Purpose: The issue resource over-allocating is a big concern for project engineers in the process
of scheduling project activities. Resource over-allocating drawback is frequently seen after
scheduling of a project in practice which causes a schedule to be useless. Modifying an
over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a
new and fast tracking method is proposed to schedule large scale projects which can help project
engineers to schedule the project rapidly and with more confidence.
Design/methodology/approach: In this article, a forward approach for maximizing net
present value (NPV) in multi-mode resource constrained project scheduling problem while
assuming discounted positive cash flows (MRCPSP-DCF) is proposed. The progress payment
method is used and all resources are considered as pre-emptible. The proposed approach
maximizes NPV using unscheduled resources through resource calendar in forward mode. For
this purpose, a Genetic Algorithm is applied to solve.
Findings: The findings show that the proposed method is an effective way to maximize NPV in
MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast
and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The
results are then compared with branch and bound method and simulated annealing algorithm and
it is found the proposed genetic algorithm can provide results with better quality. Then algorithm
is then applied for scheduling a hospital in practice.
Originality/value: The method can be used alone or as a macro in Microsoft Office Project®
Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities
after scheduling a project. This can help project engineers to schedule project activities rapidly
with more accuracy in practice.Peer Reviewe
A Review on Energy Consumption Optimization Techniques in IoT Based Smart Building Environments
In recent years, due to the unnecessary wastage of electrical energy in
residential buildings, the requirement of energy optimization and user comfort
has gained vital importance. In the literature, various techniques have been
proposed addressing the energy optimization problem. The goal of each technique
was to maintain a balance between user comfort and energy requirements such
that the user can achieve the desired comfort level with the minimum amount of
energy consumption. Researchers have addressed the issue with the help of
different optimization algorithms and variations in the parameters to reduce
energy consumption. To the best of our knowledge, this problem is not solved
yet due to its challenging nature. The gap in the literature is due to the
advancements in the technology and drawbacks of the optimization algorithms and
the introduction of different new optimization algorithms. Further, many newly
proposed optimization algorithms which have produced better accuracy on the
benchmark instances but have not been applied yet for the optimization of
energy consumption in smart homes. In this paper, we have carried out a
detailed literature review of the techniques used for the optimization of
energy consumption and scheduling in smart homes. The detailed discussion has
been carried out on different factors contributing towards thermal comfort,
visual comfort, and air quality comfort. We have also reviewed the fog and edge
computing techniques used in smart homes
Application of expert systems in project management decision aiding
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method
The 1990 progress report and future plans
This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers
Gain-scheduled H∞ control via parameter-dependent Lyapunov functions
Synthesising a gain-scheduled output feedback H∞ controller via parameter-dependent Lyapunov functions for linear parameter-varying (LPV) plant models involves solving an infinite number of linear matrix inequalities (LMIs). In practice, for affine LPV models, a finite number of LMIs can be achieved using convexifying techniques. This paper proposes an alternative approach to achieve a finite number of LMIs. By simple manipulations on the bounded real lemma inequality, a symmetric matrix polytope inequality can be formed. Hence, the LMIs need only to be evaluated at all vertices of such a symmetric matrix polytope. In addition, a construction technique of the intermediate controller variables is also proposed as an affine matrix-valued function in the polytopic coordinates of the scheduled parameters. Computational results on a numerical example using the approach were compared with those from a multi-convexity approach in order to demonstrate the impacts of the approach on parameter-dependent Lyapunov-based stability and performance analysis. Furthermore, numerical simulation results show the effectiveness of these proposed techniques
- …