In Salah CO2 Storage JIP: CO2 sequestration monitoring and verification technologies applied at Krechba, Algeria

Abstract

AbstractThe In Salah project in Algeria is an industrial-scale CO2 storage project in operation since 2004. Carbon dioxide from several gas fields with a CO2 content of 1–10% is removed from the production stream to meet the export specification of 0.3% CO2. It is re-injected it into a 20 m thick fractured sandstone formation down-dip of the Krechba producing field at a depth of around 1850 m. There are currently three horizontal injectors at Krechba, injecting up to 50 mmscfd of CO2 and drilled perpendicular to the dominant fracture orientation to maximize injection capacity. Over the life of the project it is planned to store up to 17 million tonnes of CO2–to date, just over 3 million tonnes of CO2 have been injected. A Joint Industry Project (JIP) was set up in 2005 to monitor the CO2 storage process using a variety of geochemical, geophysical and production techniques over a 5 year period.A pre-injection risk register was prepared as part of the initial assessment of the injection site which was used to design the original monitoring programme. Key risks identified included leakage from old wellbores and possible vertical leakage through the overburden. Four years after injection start up, a quantitative risk assessment was undertaken which identified wellbore integrity and potential migration of CO2 out of the licensed storage area as the key risks which resulted in further changes to the forward monitoring programme. A data collection programme was initiated prior to the start of injection in August 2004. A number of monitoring technology reviews have been conducted over the last 5 years using detailed modeling and a Boston Square which has been invaluable in comparing the relative cost and value of quite diverse technologies.To date, with the exception of the CO2 encountered in the old KB-5 appraisal well (now fully decommissioned), there has been no indication of any CO2 moving out of the storage complex (comprising the injection zone and the immediate overburden). The suite of technologies to be deployed at any CO2 storage site for monitoring and verification purposes is readily available and uses mainly standard oilfield techniques and practices. However, each site will require a site specific suite of cost effective and focused technologies to provide the maximum benefit–there is no “cookie cutter” approach when it comes to designing a Monitoring and Verification programme. Our experience at Krechba to date is only in the early phases of a programme which could extend for 20 years and our key conclusions from the first 5 years of monitoring will be presented

Similar works

This paper was published in Elsevier - Publisher Connector .

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.