Laboratory and field partial discharge measurement in HVDC power cables

Abstract

A range of experimental and field measurements of partial discharge (PD) activity under high voltage direct current (HVDC) conditions have been conducted with the goal of developing effective monitoring techniques for PD in HVDC cables and ancillary equipment, particularly in offshore renewable energy HVDC grid installations. Laboratory measurements on insulation test objects and cross linked polyethylene (XLPE) cable samples have been conducted to better understand the characteristics of PD activity under direct current (DC) stress in comparison with AC. In addition, long-term PD measurements carried out at both an HVDC cable aging laboratory and an in-service HVDC interconnector circuit are presented together with a description of the monitoring system architecture

Similar works

Full text

thumbnail-image

University of Strathclyde Institutional Repository

redirect
Last time updated on 18/04/2017

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.