Knowledge management model and instrument for implementation and adoption; perspective of developing country

Abstract

This paper presents a KM model that comprises a set of KM hypothesis model and measurement models for understanding and implementation. Research uses 323 questionnaire surveys. A hypothesized model of KM process was tested using structural equation modelling approach with a proposed model and the instrument was therefore developed. 549 five constructs of knowledge acquisition, creation, sharing, storage and dissemination with their reliability and Cronbach's Alpha coefficient of 0.80, 0.71, 0.82, 0.87 and 0.87 respectively were used. Likewise, all fit indices and factor loadings were significant leading to a frugal model achievement. The study serves as a guide to KM for the construction organization implementation

Similar works

Full text

thumbnail-image

Universiti Teknologi Malaysia Institutional Repository

redirect
Last time updated on 27/02/2017

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.