Summary of Valdez v. Cox Commc’ns Las Vegas, 130 Nev. Adv. Op. 89

Abstract

The Court determined that: (1) under NRCP 21, when claims are severed, two separate actions exist and severed claims may be appealed before resolution of the other, non-severed claims; and (2) a final order for severed claims need not be certified under NRCP 54(b) before appeal

Similar works

Full text

thumbnail-image

bepress Legal Repository

redirect
Last time updated on 16/02/2017

This paper was published in bepress Legal Repository.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.