Complexity and approximability of scheduling resumable proportionally deteriorating jobs

Abstract

A set of independent, resumable and proportionally deteriorating jobs is to be executed on a single machine. The machine is not continuously available for processing but the number of non-availability periods, the start time and end time of each period are known in advance. The criterion of schedule optimality is the maximum completion time. It is proved that the decision version of the problem with a single non-availability period is ordinarily -complete. It is also proved that for the problem with a single non-availability period there exists a fully polynomial-time approximation scheme. Finally, it is proved that for the problem with two or more non-availability periods there does not exist a polynomial-time approximation algorithm with a constant worst-case ratio, unless .Scheduling Deteriorating jobs Complexity theory Fully polynomial-time approximation scheme

Similar works

Full text

thumbnail-image

Research Papers in Economics

redirect
Last time updated on 06/07/2012

This paper was published in Research Papers in Economics.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.