Sinai Water Resources Study - Assessment of phase I (Supplementary Action) second addendum: Report on mission to Egypt 18 September to 10 October 1988

By 
Topics: Hydrology
Publisher: Institute of Hydrology
Year: 1988
OAI identifier: oai:nora.nerc.ac.uk:14241

Suggested articles

Citations

  1. (1988). A n Interim Report was submitted in
  2. (1988). a Second Addendum was signed between
  3. (1988). A t the request of RI WR the start of the mission was postponed until 18
  4. (1988). An Interim Report, submit ted in
  5. (1988). France have been appointed as external consultants for Phase 2. The external project coordinator arrived in Cairo on 6
  6. (1988). Interim report No.1 of the study dated doi
  7. (1989). It would be preferable to complete this by
  8. (1988). Pumping tests were made on several wells in the El A dsh area in
  9. (1987). REVI EW OF PROGR ESS The A ssessment Study Report of
  10. (1988). STA LLA T ION RI WR purchased three Commodore 40-40 microcomputers in
  11. (1987). T he consulting services of the Faculty of Engineering of Cairo University were appointed by RIWR in
  12. (1988). The external consultants have been appointed for Phase 2, which is deemed to have started on 7
  13. (1987). tion, the Consultant will review progress since his last visit on thc other activi ties to be undertaken by the RIW R in order to consolidate SWRS phase 1 operations, details of which are given in appendix 2 of thc Consultant 's report dated
  14. (1987). to review and assess thc activities and progress of Phase 1 and to assist R IWR in plann ing an extension of the project (Phase 2).