research article review journal article

The Kambarata 2 blast-fill dam, Kyrgyz Republic: blast event, geophysical monitoring and dam structure modelling

Abstract

peer reviewedAbstract Background The blast-and earth-fill dam of the Kambarata 2 hydropower station is situated in the seismically active Central Tien Shan region of the Kyrgyz Republic. More than 70% of the dam volume was produced during a blast event on December 22, 2009. In 2010– 2011, dam construction was completed after earth filling on top of the blasted material and installing concrete and clay screens together with bentonite grouts. A geophysical survey had been completed in 2012–2013, mainly to monitor the resistivities inside the dam. ..

Similar works

Full text

thumbnail-image

Open Repository and Bibliography - Liège

redirect
Last time updated on 03/08/2016

This paper was published in Open Repository and Bibliography - Liège.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.