A methodology for assessing geotechnical hazards for TBM tunnelling - Illustrated by the Athens Metro, Greece
Abstract
Abstract is not available.- Hazard assessment
- TBM tunnelling
- Vulnerability index
- Engineering, Geological
- Mining & Mineral Processing
- Hazards
- Mining
- Parameter estimation
- Probabilistic logics
- Risk assessment
- Safety factor
- Tunneling (excavation)
- Underground structures
- Ground conditions
- Vulnerability evaluation
- Rock mechanics
- ground conditions
- hazard assessment
- TBM
- tunneling
- Athens [Attica]
- Attica
- Eurasia
- Europe
- Greece
- Southern Europe
- Hazard assessment
- TBM tunnelling
- Vulnerability index
- Engineering, Geological
- Mining & Mineral Processing
- Hazards
- Mining
- Parameter estimation
- Probabilistic logics
- Risk assessment
- Safety factor
- Tunneling (excavation)
- Underground structures
- Ground conditions
- TBM tunnelling
- Vulnerability evaluation
- Rock mechanics
- ground conditions
- hazard assessment
- TBM
- tunneling
- Athens [Attica]
- Attica
- Eurasia
- Europe
- Greece
- Southern Europe