Optimizing Plant-line Schedules and an Application at Hidden Valley Manufacturing Company

Abstract

Interfaces, 32, pp. 1-14.A plant line schedule specifies a plant's sustained batch operations over time with detail sufficient to manage all activities. Plantwide considerations include restrictions on how production centers can be formed from production lines, packaging lines, conveyers, and so forth; the cost and time of product-package item setups, changeovers, and shutdowns; honoring instock service levels, minimum inventory, and committed shipments; recognizing efficiency gains with longer batch runs; respecting crew constraints; and the costs of materials, labor, and carrying inventory. We developed a cost-minimizing optimization model, PROFITS, that features multiple independent time streams for various categories of events that mimic existing periodic reviews of operations. PROFITS is embedded in a graphical user interface that eases the grueling aspects of scheduling, preparing data, controlling scenarios, and visualizing results. At Hidden Valley Manufacturing Company, completing an eight-week plant-line schedule takes about an hour. This is much faster than manual scheduling was-and the schedules are better

Similar works

Full text

thumbnail-image

Calhoun, Institutional Archive of the Naval Postgraduate School

redirect
Last time updated on 26/05/2016

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.