Location of Repository

Joint Tactics, Techniques, and Procedures for Manpower Mobilization and Demobilization Operations: Reserve Component (RC) Callup

By Joint Pub Preface and Rc Callup

Abstract

This report is filed on the first day of the second fiscal year quarter after the quarter in which the first unit is ordered to active duty under the partial mobilization, and on the first day of each succeeding six-month period thereafter for so long as the unit or units are on active duty. . The Global Command and Control System (GCCS) is our nation's conventional, joint, automated command and control (C2) system. GCCS supports the Joint Planning and Execution Community via the use of an integrated set of analytic tools, flexible data transfer, and robust communications capabilities. Although developed initially as a C2 system and not tailored to the MSO's needs as a "planner's tool", the Joint Operation Planning and Execution System (JOPES) provides access to valuable information such as JOPES TPFDDs, the Status of Resources and Training System (SORTS), and unit structure data. GCCS has several report generation capabilities, including an ad hoc query feature, that the MSO can use to search for specific information needs. The GCCS links C2 from the NCA down to the joint task force and component commanders. . The MSO monitors situation reports (SITREPs) and other message traffic for actions or information with mobilization implications. Service MSOs have information systems that they are able t

OAI identifier: oai:CiteSeerX.psu:10.1.1.31.705
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://www.dtic.mil/doctrine/j... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.