O1-01 Enhancements in the

By Thorp Reprocessing Plant, Michael. J. Wakem and Martin Brownridge

Abstract

A number of successful enhancements have been made to the process at the Thorp reprocessing plant at Sellafield. After a long and detailed Research and Development programme followed by an intensive design/construction project, Thorp was inactively commissioned with first active shear in March 1994. The plant has now reached a mature stage in its development, following successful active commissioning demonstrating flowsheet or better performance in the solvent extraction cycles. Enhancements are now sought to achieve a range of objectives. Against a background of ever tighter regulatory control both in terms of safety and environmental discharge, BNFL are continuing to invest in further improvements with short, medium and longer term objectives to improve plant throughput; expand the range of feed fuels; reduce environmental discharges and reduce running costs. This paper describes a few of these enhancements

Year: 2011
OAI identifier: oai:CiteSeerX.psu:10.1.1.195.5554
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://www-atalante2004.cea.fr... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.