Location of Repository

Grand Gulf Nuclear Station

By Mr. George, A. Williams, D. Blair Spitzberg, Ph. D, Strawn Llp and Jay Barkley Chief

Abstract

Station. The purpose of the inspection was to observe the fluid operations segment of your Independent Spent Fuel Storage Installation (ISFSI) pre-operational testing program. The canister loading activities observed included canister pressure testing, draining, moisture removal and helium backfilling. The canister unloading activities observed included canister shell cooling with the Supplemental Cooling System, canister shell cooling with annulus flushing, canister gas cooling, canister gas sampling and canister reflooding. The enclosed inspection report documents the results of that inspection, which were discussed with members of your staff during the exit meeting on September 15, 2006. The inspection determined that you are conducting pre-operational testing activities in compliance with the Commission's rules and regulations and within the conditions of your license as they relate to pre-operational testing activities. No violations were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NR

Topics: Environmental Compliance and
Year: 2006
OAI identifier: oai:CiteSeerX.psu:10.1.1.186.2842
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://adamswebsearch.nrc.gov/... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.