PERMANENT PLANT MODIFICATIONS BASELINE INSPECTION

By Mr. Charles, G. Pardee, David E. Hills and Engineering Branch

Abstract

evaluations of changes, tests, or experiments and permanent plant modifications inspection at your Braidwood Station, Units 1 and 2. The enclosed report documents the inspection results, which were discussed on September 12, 2008, with Mr. Larry Coyle and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission’s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC’s “Rules of Practice, ” a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component ofC. Pardee-2-NRC’s document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room)

Topics: Site Vice President- Braidwood Station Plant Manager- Braidwood Station Regulatory Assurance Manager, Byron and LaSalle Associate General Counsel Document Control Desk- Licensing Assistant Attorney Gene, State Liaison Officer
Year: 2008
OAI identifier: oai:CiteSeerX.psu:10.1.1.186.2157
Provided by: CiteSeerX
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://citeseerx.ist.psu.edu/v... (external link)
  • http://adamswebsearch.nrc.gov/... (external link)
  • http://www.nrc.gov/reading-rm/... (external link)