Institute of Electrical and Electronics Engineers Inc.
Doi
Abstract
The paper describes the 400 kV AC submarine link under the Dardanelles Strait composed of 12 submarine armoured single-core XLPE-insulated cables (plus a back-up power cable). The link consists of two parallel-operated double-circuit link named Lâpseki-Sütlüce I and Lâpseki-Sütlüce II. The whole transmissible power is 4000 MW (1000 MW per circuit) and the average length for a single-core cable is about 4,6 km: the submarine cables are part of overhead lines. The paper gives a wide overview of the cable installations and chiefly of the cable protections on the seabed: different protection choices have been extensively used (i.e. water jetting and mattressing)
Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.