Generation Adequacy and Investment Incentives in Britain: from the Pool to NETA

By Fabien A. Roques, David Newbery and William J. Nuttall

Abstract

Three years after the controversial change of the British market design from compulsory Pool with capacity payments to decentralised energy-only New Electricity Trading Arrangements (NETA) market framework, we compare the two designs in terms of investment incentives. We review the biases of the Pool capacity payments design, the drought of investment following the introduction of NETA, and the reaction of the market during the first “stress-test” of NETA during the winter 2003. In an energy-only market such as NETA, it is essential that price signals are right and the system operator has a crucial role in contracting ahead for reserve. We recommend that NETA adopt a single marginal imbalance price as dual imbalance pricing distorts price signals in times of scarcity. The lack of long-term contracting that causes hedging and financing difficulties for power projects can becompensated by vertical and horizontal reintegration at a cost of increased market power

Topics: Classification-JEL: D24, D43, D92, L94, investment, electricity, market design, capacity payments
Publisher: Faculty of Economics
Year: 2006
OAI identifier: oai:www.repository.cam.ac.uk:1810/131567
Provided by: Apollo

Suggested articles

Citations

  1. (2002). (2002a), “Competing for capital: Recognising utilities’ worth”,
  2. (2003). A Critique of the Resource Adequacy Requirement Proposed in FERC's SMD NOPR”, The Electricity Journal, doi
  3. (2003). A day in the Life… - An operators view of Tuesday 10th
  4. (2002). A market approach to long term security of supply”, doi
  5. (2003). A study into certain aspects of the cost of capital for regulated utilities in the UK”, on behalf of Smithers & Co Ltd., for the UK economic regulators and Office of Fair Trading,
  6. (2002). An independent review of NETA”,
  7. (2003). Asset Risk Management Survey: Composite Industry Report”,
  8. (2003). Auctions and Trading In Energy Markets - An Economic Analysis’,
  9. (1989). available upon request from doi
  10. (2003). British Energy signs major supply deal with Centrica”,
  11. (2000). Capacity payments and pricing of reliability in competitive generation markets", doi
  12. (2003). Capacity subscription and security of supply in deregulated electricity markets”, SINTEF Energy Research,
  13. (2002). Competition in retail electricity supply”, CMI Working paper 09, doi
  14. (1987). Contract duration and relation-specific investments’,
  15. (2002). Council of Australian Governments, “Towards a Truly National and Efficient Energy Market”, (The Parer Report),
  16. (1999). Cycles in competitive electricity markets: a simulation study of the western United States”, doi
  17. (2004). Did English generators play Cournot? Capacity withholding in the Electricity Pool”, CMI Working Paper 41,
  18. (1994). Diversity and Ignorance in electricity supply investment. Addressing the solution rather than the problem”, Energy Policy, doi
  19. (2004). Electricity liberalisation in Britain: the quest for a satisfactory wholesale market design”, doi
  20. (2003). Electricity market reform failures: UK, Norway, Alberta and California”. doi
  21. (2002). Electricity Markets and Capacity Obligations”, A report for the DTI,
  22. (2003). Energy Markets Unit, “Proposals for a special administrator regime for energy network companies”, Consultation document,
  23. (2002). Energy trading: Re-establishing sound foundations”,
  24. (2003). Energy White Paper, “Our energy future: Creating a low carbon economy”,
  25. (2004). Energy, the State, and the Marke:, British Energy Policy since 1979, doi
  26. (1997). Estimating the Customer-Level Demand for Electricity Under RealTime Market Prices”, doi
  27. (2003). Fitch Rating, “The battle for Drax – Are UK generators back in power?”,
  28. (1999). Generation Adequacy: Who decides?”, doi
  29. (1999). Generation and transmission adequacy in a restructured US electricity industry", Report to the EEI,
  30. (1997). Getting Markets to Clear”, doi
  31. (2003). High stakes in the European utilities poker game, Ernst and Young publication.
  32. (2004). Imperial College, “Generating Profits? Experience of liberalised electricity markets”.
  33. (2004). Income adjusting event under National Grid Company’s 2003/04 System Operator incentive scheme, A decision document,
  34. (2002). Industry Committee (2002), House of Commons, Fourteenth Report, “Energy Supply: how secure are we?”,
  35. (2003). Industry Committee (2003a), House of Commons, Fifth Report, “The British electricity trading and transmission arrangements”,
  36. (2004). Insufficient Incentives for Investment in Generation”, CMI Working Paper 42, doi
  37. (2003). Interim Energy Management Limited (IEML)
  38. (1982). Investment decisions and long-term planning under electricity spot pricing”, doi
  39. (2002). Investment Efficiency in Competitive Electricity Markets With and Without Time-Varying Retail Prices”, Center for the Study of Energy Markets (CSEM) Working Paper 106, doi
  40. (2003). Investment in power generation: a banker’s perspective”, presentation at the 25 th
  41. (2002). Is Electricity a right?” – The Electricity journal, doi
  42. (2001). Is the Security of Supply a Public Good?”, The Electricity Journal, August/September doi
  43. (2003). Joint Energy Security of Supply Working Group DTI/OFGEM, Second report,
  44. (2003). Joint Energy Security of Supply Working Group DTI/OFGEM, Third report,
  45. (1949). La tarification des demandes en pointe: Application de la théorie de la vente au coût marginal", Revue générale de l'électricité,
  46. (2002). Lessons Learned from an IPP”, Converging Gas and Power Markets,
  47. (2002). Making Competition Work in Electricity"
  48. (2004). Market power in the England and Wales wholesale electricity market 1995-2000', CMI Electricity Project Working Paper 55, doi
  49. (1999). Measuring Duopoly Power in the British Spot Market’, doi
  50. (2002). Modification report, Modification proposal P78” – Revised Definition of System Buy Price and System Sell Price, prepared by
  51. (2003). Narrow margins revisited, the impact of recent developments on reserve margins in the UK”,
  52. (2003). National Grid Transco (2003a), “Winter operation report 2003/04”,
  53. (2002). NETA, always the bridesmaid, never the bride”, doi
  54. (1999). NGT System Operator incentives, Transmission Access and Losses under NETA: Consultation Document’,
  55. (2000). Nuclear power: least cost option for base-load electricity in Finland. doi
  56. (2000). Paper to Pool Members, “Anomalous Pool Prices during 2000, Problems and Remedies”,
  57. (1983). Peak load pricing and capacity planning with demand and supply uncertainty", doi
  58. (1998). Pool Reform and Competition in Electricity', doi
  59. (1995). Power Markets and Market Power”, doi
  60. (2002). Power Systems Economics - Designing Markets for Electricity”, doi
  61. (2004). Reliability and competitive electricity markets', CMI Electricity Project Working Paper 53, doi
  62. (2003). Retail competition and electricity contracts’, CMI Electricity Project Working Paper 33,
  63. (2004). Retail electricity competition', CMI Electricity Project Working Paper 44, doi
  64. (2000). Scarcity, market power, and price caps in wholesale electric power markets”– The Electricity Journal, doi
  65. (2002). Section on generation, available in the ‘archive’ section of NGT online library (http://www.nationalgrid.com/uk/library) National Grid Transco
  66. (2003). Security of supply April to
  67. (2002). Supply Security”, Working Paper, Inter-American Development Bank,
  68. (2004). System Operator incentive scheme from
  69. (2001). The Convergence Of Electric Power And Natural Gas Industries
  70. (1998). The death and resurrection of electric capacity pricing", Working Paper, The Brattle Group,
  71. (2003). The Demand for Operating Reserves: Key to Price Spikes and Investment,” doi
  72. (2001). The effect of falling market concentration on prices, generator behaviour and productive efficiency in the England and Wales Electricity Market”, MIT Working Paper,
  73. (2002). The Energy Review (2002) “A Performance and Innovation Unit Report” doi
  74. (2004). The Long-Run Effects of Real-Time Electricity Pricing”, Center for the Study of Energy Markets Working paper 133,
  75. (1999). The new electricity trading arrangements: Volume 1: Consultation Document’,
  76. (2002). The Political Economy of Long-Term Generation Adequacy: Why an ICAP Mechanism is Needed as doi
  77. (1997). The political economy of the Pool”, doi
  78. (2002). The question of generation adequacy in liberalised electricity markets, doi
  79. (1997). The Restructuring and Privatisation of the CEGB- Was it worth it', doi
  80. (2003). Transco (2003b), “Proposed revisions to the BSAD Methodology Statement required to facilitate Marginal Imbalance Pricing as proposed by
  81. (2003). Transco (2003c), Grid Code Consultation Document, Proposed Grid Code Modifications to Incorporate New Provisions Relating to the Flow of Information on Mothballed Plant and Alternative Fuels,
  82. (2004). Transco (2004a), Grid Code consultation document,
  83. Transco (2004b), Response to OFGEM Consultation, Electricity and Gas Cashout Review, Executive Summary.
  84. (2000). Who should pay for reserve?” - The Electricity journal, doi
  85. (2003). Why OFGEM?”,

To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.