2040 Metropolitan Transportation Plan:Tippecanoe County Red Flag Analysis

Abstract

Early project-level environmental analysis can save time and money. A Red Flag Analysis reveals possible environmental issues prior to the start of the design process and adds greater certainty to the design and budgeting process. The analysis can be done as part of the long-range transportation plan or at the pre-design project level

Similar works

This paper was published in Purdue E-Pubs.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.