Oxydation Reduction Potential (ORP) - control of the aeration in a Wastewater Treatment Plant: Nitrogen removal efficiency. A case study : the Benfeld activated sludge plant

Abstract

An increasing interest for the platinum electrode potential (commonly called Oxydation Reduction Potential (ORP)) as a control parameter for wastewater treatment has been observed for several years. The goal of this study is to analyze, starting from in-situ observations, the possibility to use ORP for aeration control in view of a thorough nitrogen removal and to evaluate its interest in the biological removal of phosphorus. The study is performed in the Benfeld wastewater treatment plant. Aeration control through potential thresholds coupled with delays help obtain a thorough nitrogen removal when the parameterization of the potential thresholds and delay duration is right. / On observe depuis plusieurs années un intérêt croissant pour le potentiel d'électrode de platine (communément appelé potentiel d'oxydo-réduction) comme paramètre de contrôle dans le traitement de l'eau usée. L'objectif de l'étude est d'analyser, à partir d'observations faites sur le site, la possibilité d'utiliser le potentiel d'électrode de platine pour l'asservissement de l'aération dans l'optique d'une élimination poussée de l'azote et d'évaluer son intérêt pour la déphosphatation biologique. L'étude est réalisée sur la station d'épuration de Benfeld. L'asservissement du fonctionnement de l'aération à des seuils de potentiel couplés à des temporisations permet d'obtenir une élimination poussée de l'azote lorsque le paramétrage des seuils de potentiel et des durées des temporisations est correct

    Similar works

    Full text

    thumbnail-image

    Available Versions