This figure shows the results of Experiment 1 (length: a,b), Experiment 2 (weight: c,d), and Experiment 3 (volume: e,f).

Abstract

<p>In Panels a, c, and e, the estimated duration in millisecond (ms) was plotted as a function of actual duration in millisecond. In Panels b, d, and f, the estimated duration was plotted as a function of the implicit magnitude. Error bars correspond to the standard error of the mean.</p

    Similar works

    Full text

    thumbnail-image

    Available Versions