Abstract

<p>The setup consisted of two plots with six quadrants each (1x1 metre) with type of treatments or control indicated. Soil of two holes per quadrant (different holes for each round) was tested for <i>B</i>. <i>pseudomallei</i> on a quarterly basis approximately. The arrow marks the direction of the water run-off in the wet season. The number indicates the <i>B</i>. <i>pseudomallei</i> occurrence with the subscript number referring to the baseline occurrence before start of treatment (total 2 holes tested per quadrant) followed by the number of <i>B</i>. <i>pseudomallei</i> positive holes during treatment (total 26 holes tested per quadrant for the duration of the experiment).</p

    Similar works

    Full text

    thumbnail-image

    Available Versions