Specific construction tests

Abstract

The technical feasibility of the Satellite Power System (SPS) is discussed. The development of feasible operational concepts and conceptualization of specific construction tasks are examined. The logic flow of functional analyses of both the rectenna and the satellite is illustrated. Constraints placed upon the construction processes and equipment by the satellite design are outlined. The construction tasks, when defined and combined into an integrated schedule establish, a time line for construction mass flow demands to be satisfied by the space transportation systems. An example of satellite constructive demands and HLLV delivery capabilities is given