research

Is the Benefit of Reserve Requirements in the “Reserve” or the “Requirement”?

Abstract

Reliability in electricity markets is, in many respects, a public good, in that one supplier’s failure to meet its customers’ demands can cause failure throughout the grid. This creates a blackout externality. One of the remedies for a blackout externality is a reserve requirement, where load-serving entities have capacity on hand to meet demand in the case of unexpected surges in demand or unit failures. Modeling the magnitude of the externality as a positive function of use and negative function of capacity reveals that a benefit of capacity requirements is that covering their costs imposes a tax on usage. After illustrating this possibility, a model addressing the sector as a whole, where spot markets can resolve individual but not overall shortfalls, illustrates that capacity requirements should be increased or decreased to exploit this usage tax effect.electricity, reliability, reserve requirements, capacity

    Similar works