This report represents Phase II of a one-year contract aimed at analyzing technical considerations linked to the potential isolation of toxic chemical waste within solution-mined caverns situated in Texas salt domes. A key objective of Phase II research was to characterize the properties of salt domes that could impact this form of waste disposal.Bureau of Economic Geolog