12 research outputs found

    The production of biogas from agricultural and animal wastes and its utilization in the integrated energy system (biogas)

    No full text
    The tasks of this research; review of biogas and energy production technologies, system simulations and decision support system (DSS) modeling, design and development of two lab-scale (one for animal waste and one for agricultural waste) and one pilot scale (250 kWe capacity) integrated biogas plant, integration of the pilot plant with energy conversion systems, experimental studies, techno-economical analysis of the biogas production, and life- cycle analysis were determined. the pilot biogas plant consist 2 reactors that have 2089 m3 net volume each and they are connected to each other. the volume of the final manure storage is 1000m3. the retention time at the plant is 47 days; ratio of organic dry matter is 9 % and the fermentation temperature is 35-40°C under mesophilic conditions.Bu çalışmada; biyogaz ve enerji üretim teknolojileri için sistem simülasyonu, karar destek sistemi (KDS) modelleme, laboratuar ölçeğinde iki (hayvansal kaynaklı ve tarımsal kaynaklı atıklar için ayrı ayrı) ve 250 kWe kapasitesinde pilot ölçekli bir entegre biyogaz tesisi tasarlanıp imal edilmesi, enerçi dönüşüm sistemleriyle entegrasyonu, deneysel çalışmalar, teknik-ekonomik analizler ve yaşam döngü analizleri incelenmiştir. Oluşturulan pilot tesis için 2 adet birbirine bağlı ve her birinin net 2089 m3 hacmi olan üreteç imal edilmiştir. Nihai ürün deposunun hacmi 1000m3 olarak seçilmiştir. En uygun bekleme süresinin de 47 gün olduğu tespit edilmiştir. Organik kuru madde oranı 9% ve üreteç içi sıcaklığının mezofil koşullarda 35-40°C'de en uygun olduğu belirlenmiştir
    corecore