17 research outputs found
Social and Economic Challenges of Implementing Sustainable Materials on Buildings in Kuwait
Many factors affect attaining the required credits for LEED materials and Many factors affect attaining the required credits for LEED materials and
resources (MR) section. There are disadvantages in obtaining credits and LEED
certifying an existing building in Kuwait to become a sustainable green building. LEED
is still relatively new in Kuwait and the Gulf region, therefore, when certifying an
existing governmental building, difficultly is faced with obtaining complete building
owners, building upper management and occupant cooperation. This raises challenges
when requiring cooperation from building occupants and cleaning staff for the solid
waste management credits which require dedication to reduce the amount of waste going
to landfills and incinerating facilities. The mindset of the contractor and subcontractor
has to change to gain full understanding and cooperation in the waste management of
construction materials when constructing new buildings and performing facility
alterations on site. The selection of sustainable materials is more challenging as many
materials are not available in Kuwait and the surrounding Gulf countries. Transportation
from aboard should be decreased as much as possible to reduce cost as well as decreasing
negative environmental impacts. Green certified materials are more expensive, therefore
decision maker have to be willing to pay the extra cost.
This paper discusses the challenges faced by KISR team as a consultancy body to
certify an existing building according to LEED rating system from the material and
resources aspect. It discusses the acceptance of the building owners, building upper
management and the building occupants to this change and their understanding and
cooperation. Many materials for MR credits 2 and 3 were found difficult to be obtained in
Kuwait and the surrounding gulf region. Some materials were found to be available in the
resources (MR) section. There are disadvantages in obtaining credits and LEED
certifying an existing building in Kuwait to become a sustainable green building. LEED
is still relatively new in Kuwait and the Gulf region, therefore, when certifying an
existing governmental building, difficultly is faced with obtaining complete building
owners, building upper management and occupant cooperation. This raises challenges
when requiring cooperation from building occupants and cleaning staff for the solid
waste management credits which require dedication to reduce the amount of waste going
to landfills and incinerating facilities. The mindset of the contractor and subcontractor
has to change to gain full understanding and cooperation in the waste management of
construction materials when constructing new buildings and performing facility
alterations on site. The selection of sustainable materials is more challenging as many
materials are not available in Kuwait and the surrounding Gulf countries. Transportation
from aboard should be decreased as much as possible to reduce cost as well as decreasing
negative environmental impacts. Green certified materials are more expensive, therefore
decision maker have to be willing to pay the extra cost.
This paper discusses the challenges faced by KISR team as a consultancy body to
certify an existing building according to LEED rating system from the material and
resources aspect. It discusses the acceptance of the building owners, building upper
management and the building occupants to this change and their understanding and
cooperation. Many materials for MR credits 2 and 3 were found difficult to be obtained in
Kuwait and the surrounding gulf region. Some materials were found to be available in th
Risk of breast cancer in women after a salivary gland carcinoma or pleomorphic adenoma in the Netherlands
Salivary and mammary gland tumors show morphological similarities and share various characteristics, including frequent overexpression of hormone receptors and female preponderance. Although this may suggest a common etiology, it remains unclear whether patients with a salivary gland tumor carry an increased risk of breast cancer (BC). Our purpose was to determine the risk of BC in women diagnosed with salivary gland carcinoma (SGC) or pleomorphic adenoma (SGPA). BC incidence (invasive and in situ) was assessed in two nationwide cohorts: one comprising 1567 women diagnosed with SGC and one with 2083 women with SGPA. BC incidence was compared with general population rates using standardized incidence ratio (SIR). BC risk was assessed according to age at SGC/SGPA diagnosis, follow-up time and (for SGC patients) histological subtype. The mean follow-up was 7.0 years after SGC and 9.9 after SGPA diagnosis. During follow-up, 52 patients with SGC and 74 patients with SGPA developed BC. The median time to BC was
Ontoereikende diagnostiek bij een fractuur van het collum mandibulae
Een 13-jarige jongen presenteerde zich bij een mond-, kaak- en aangezichtschirurg na een val van zijn skateboard met pijn aan zijn kin en preauculaire pijn. Er werden op een panoramische röntgenopname geen aanwijzingen gevonden voor een fractuur van het collum mandibulae. Na 2 weken werd hij door zijn orthodontist naar de afdeling Mond-, Kaak- en Aangezichtschirurgie van een medisch centrum verwezen voor een teruggekeerde klasse IIImalocclusie na een kortgeleden afgeronde orthodontische behandeling van dit probleem. Een computertomogram toonde een fractuur van het collum mandibulae. Bij verdenking op een dergelijke fractuur is altijd beeldvorming uit 2 richtingen noodzakelijk