27 research outputs found

    The future obligations of "project manager" as construction integral director (DIPE) in the law of buildings construction in spain (LOE)

    Get PDF
    In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE

    La Necesidad De Una Regulacion Legal En España De La Figura Del Director De Proyectos En Edificacion (Project & Construction Manager)

    Get PDF
    La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental

    El análisis de la dirección integrada de proyectos (project & construction management) en el marco europeo: propuesta de regulación en España y su inclusión en la ley de la ordenación de la edificación

    Full text link
    El presente trabajo de Tesis Doctoral surge de la Figura de la Dirección Integrada de Proyecto en Edificación (“Project & Construction Management”) y su analisis de la situación regulatoria en la legislación española. El primer planteamiento fue pensar en la situación actual de esta figura en el contexto internacional, para analizar su repercusión en el sector de la edificación, lo cual me llevo a cabo las siguientes preguntas que he reuelto en esta investigación. ¿ Como surge el ¨Project & Construction Management”? ¿ Cuales son sus actividades, funciones y cometidos? ¿ Existe el ¨Project & Construction Management” en otros países? ¿Hay regulación del ¨Project & Construction Management” en esos paises? ¿Cómo es la regulación del ¨Project & Construction Management”? ¿Existe demanda del ¨Project & Construction Management” en España? ¿Cómo es esa demanda en España, y como se puede cuantificar? ¿Existe regulación del ¨Project & Construction Management” en España? ¿ Como debería ser la regulación del ¨Project & Construction Management” en España? Todas las preguntas anteriores las he ido respondiendo con el presente trabajo, llegando a una serie de respuestas, que están reflejadas en el desarrollo del presente trabajo y que resumo: - EL ¨Project & Construction Management” surge a principios del siglo XX en USA, desarrollándose como una disciplina con metodología propia y extendiéndose por otros países. - EL ¨Project & Construction Management” es una disciplina, basada en una metodología propia con herramientas y técnicas para organizar cualquier 14 proyecto de cualquier tipo, pero en este caso un proyecto de edificación, para lo cual he definido con todo detalle esta figura. - El origen del ¨Project & Construction Management” es anglosajón, concretamente en USA, extendiendose luego al Reino Unido, a Europa (Francia y Alemania), a Asia, a América del Sur y a Oceanía. - En todos los paises estudiados (Estados Unidos, Reino Unido, Francia y Alemania) existe una regulación sobre el ¨Project & Construction Management” que me ha servido de base comparativa para introducirla en España. - Hay muchas empresas en España (Nacionales e Internacionales) que ejercen su actividad dentro de este sector, por lo que para realizar un estudio más profundo, hice una muestra de las 30 empresas más significativas, prepare un cuestionario, dividido en 5 apartados: Organizativo, Sectorial, Cualitativo, Cuantitativo y Profesional para obtener una radiogradía de la situación real del sector, y así valorar cual es la importancia de este agente. - Estudié las posibles regulaciones del ¨Project & Construction Management” en España y no encontré ninguna. - El lugar idóneo para que se regule al ¨Project & Construction Management” es la Ley de Ordenación de la Edificación (LOE), ya que la jurisprudencia (sentencias de los tribunales de justicia españoles) le ha asimilado con los agentes de la LOE y se ha basado para absolver o condenar en la Ley de Ordenación de la Edificación. Por lo que el Objetivo fundamental de esta tesis ha sido regular la figura del ¨Project & Construction Management”, traducirla al Castellano, definirla y realizar una estructura de Agente de la Edificación, según la LOE, para poder introducirla dentro de la Legislación Española, con el objeto de mejorar la calidad de la edificación, proteger al usuario, estableciendo responsabilidades y garantías y proteger al ¨Project & Construction Management” de las responsabilidades solidarias. ABSTRACT This Doctoral Thesis figure emerges from the Integrated Building Project ("Project & Construction Management") and his analysis of the regulatory situation in the Spanish legislation. The first approach was to think of the current situation of this figure in the international context, to analyze its impact on the building sector, which I conducted the following questions that I have met in this research. - How did the “Project & Construction Management "? - What are your activities, functions and duties? - Is there a “Project & Construction Management "in other countries? - Is there regulation “Project & Construction Management "in these countries? - How is regulation of ¨ Project & Construction Management "? - Is there demand “Project & Construction Management "in Spain? - How is that demand in Spain, and as you can quantify? - Is there regulation “Project & Construction Management "in Spain? - How should regulation ¨Project & Construction Management "in Spain? All the above questions have been answered with this study, leading to a series of responses, which are reflected in the development of this study and are summarized: - The ¨ Project & Construction Management "comes early twentieth century in the USA, developed as a discipline with its own methodology and extending other countries. - The ¨ Project & Construction Management "is a discipline based on a metodology own tools and techniques to organize any project of any kind, but in this case a building project, for which I have defined in detail this figure. - The origin of ¨Project & Construction Management "is Anglo-Saxon, particularly in USA, then spreading to the UK, Europe (France and Germany), Asia, South America and Oceania. - In all countries studied (USA, UK, France and Germany) there is a regulation on ¨Project & Construction Management "has helped me to introduce comparative base in Spain. - There are many companies in Spain (National and International) who perform work within this sector, so for further study, I made a sample of the 30 most important companies, prepare a questionnaire, divided into five sections: Organizational , Sector, Qualitative, Quantitative and Professional radiography for a real situation of the sector, and thus assess which is the importance of this agent. - Study the possible regulations ¨Project & Construction Management "in Spain and found none. - The place to be regulated to ¨Project & Construction Management "is the Law of Construction Planning (LOE), as the case law (judgments of the courts Spanish) has assimilated LOE agents and has been based to absolve or condemn Law Construction Planning. So the objective of this thesis has been regular figure ¨ Project & Construction Management ", translated to spanish, define and perform an Agent structure of the Building, as the LOE, to enter into Spanish law, in order to improve the quality of the building, protecting the user, establishing responsibilities and guarantees and protect the ¨ Project & Construction Management "solidarity responsibilities

    La norma internacional ISO 21500 y su interrelación con la gestión de proyectos BIM, Building Information Modeling

    Get PDF
    Siempre ha habido momentos de cambios durante la historia de la construcción, y cada cambio ha sido estudiado profundamente. En la práctica actual la construcción presta una atención cada vez mayor a la Gestión y Dirección de Proyectos, y es por esto que las grandes organizaciones están adoptando herramientas que faciliten esta gestión. La metodología BIM es una de estas herramientas, pero ha traído como consecuencia una separación de ideologías. Se ha empezado a comparar las diferencias entre la gerencia de un proyecto mediante el proceso tradicional y la gestión a través de esta metodología. BIM puede suponer una ventaja decisiva en el camino hacia una gestión eficiente. A su vez BIM es un recurso de Gestión de Información, y como tal, puede ser utilizado para ilustrar el proceso completo de edificación, de mantenimiento e incluso de demolición; BIM es una plataforma abierta de información del proyecto disponible para todos los agentes involucrados (“stakeholders”) en el proceso de construcción, al igual que la ISO 21500, tiene procesos y procedimientos; y, al igual que ésta, áreas de conocimiento y fases para cada entregable del proceso. BIM es la metodología que permite la compartición de la información de forma eficaz y fiable e ISO 21500 la Gestión de los procesos de compartición

    Aplicaciones de la tecnología geofísica de georradar junto con la termografía infrarroja, el perfilómetro y otras tecnologías complementarias, en la construcción. Limitaciones y posibilidades

    Get PDF
    Georadar technology has proven to be highly effective in the diagnosis and analysis of soils and the most diverse applications thanks to its effectiveness and non-destructive characteristics. This article describes and analyzes the use of georadar technology supported by other complementary ones, such as the ground electromagnetic survey, infrared thermography, infrared photography and multispectral photography, all of them used together for a common objective in concrete examples related to the field of the construction. Subsequently, the characteristics of the construction systems and the environment that can condition the effectiveness of the results and reduce the advantages of the joint use of the different systems are analyzed, which will allow future actions to adjust the scope of the objectives, optimize the advantages the complementarity of the different systems and, therefore, will open a range of possibilities for future use.La tecnología del georradar se ha probado de gran eficacia en la diagnosis y análisis de suelos y las más diversas aplicaciones gracias a su efectividad y sus características no destructivas. El presente artículo describe y analiza la utilización de la tecnología del georradar apoyada en otras complementarias, como son el perfilómetro, la termografía infrarroja, la fotografía infrarroja y la fotografía multiespectral, empleadas conjuntamente en ejemplos concretos de análisis de construcciones con objetivos relacionados con la detección y diagnóstico de deficiencias en los proyectos. Posteriormente, se analizan las características de los sistemas constructivos y del entorno que pueden condicionar la efectividad de los resultados y merma las ventajas de la utilización conjunta de los distintos sistemas, lo que permitirá en futuras actuaciones ajustar el alcance de los objetivos, optimizar las ventajas de la complementariedad de los distintos sistemas y, por tanto, permitirá abrir un abanico de posibilidades de utilización futura

    La financiacion publico-privada (PPP-PPI) como alternativa a la rehabilitacion del patrimonio del estado

    Full text link
    En la actualidad, la administración española tiene pocos recursos económicos disponibles para la rehabilitación del patrimonio, para lo cual necesitarían una financiación externa, realizada por fondos privados. La Dirección Integrada de Proyecto (“Project Management“) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. La financiación público-privada es una forma de no consolidar la deuda dentro del balance de la Administración Pública, según los criterios del SEC-95 EUROSTAT que, transfiriendo dos riesgos de los tres citados a continuación al sector privado puede ser que no se consolide la deuda dentro del balance de la Administración. Los riesgos fundamentales son: - Riesgo de construcción - Riesgo de disponibilidad - Riesgo de demand

    Health and safety in the construction : subject pending to be included in the curriculum of architecture in Spain

    Get PDF
    The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that are

    Una mejora en la planificación de la construcción: el sistema del último planificador

    Full text link
    [EN] For approximately five years, the Last Planner System ® has been used more and more in Spain, due to the improvement that its use produces in the productivity of the construction, reaching, with its use, better results in the achievement of the objectives of: Cost, time and quality of the projects. But still it is necessary its knowledge and diffusion so the application of this System will be normal in all our works. It was Professors Glenn Ballard and Greg Howell of the University of Berkeley in California, United States, who in the early 90s of the last Century investigated a form of planning of the work that, within the Lean Construction philosophy, were more appropriate with the special characteristics of the construction process. Lean Construction contributes with numerous associate techniques to improve the constructive process, and one of them is Last Planner System ®. In this paper we will do a quick revision of the state of art related with Planification Methodologies which have been used in construction during last and present centuries, to conclude that Last Planner System ® represents a considerable improvement in relation with previous Systems. It is an opinion and reveal paper to promote the knowledge and use of this System in Spanish Construction with greatest interest.[ES] Desde hace aproximadamente cinco años, se está utilizando cada vez más en España el Sistema del Último Planificador (Last Planner System ®), debido a la mejora que su utilización produce en la productividad de la construcción, alcanzándose, con su uso, mejores resultados en la consecución de los objetivos de: Coste, plazo y calidad de los proyectos. Pero aún es necesario su conocimiento y difusión para que la aplicación de este Sistema se extienda a todas nuestras obras. Fueron los Profesores Glenn Ballard y Greg Howell de la Universidad de Berkeley en California, Estados Unidos, quienes a principios de los años 90 del pasado Siglo investigaron sobre una forma de planificación de obra que, dentro de la filosofía Lean Construction, fuera más acorde con las especiales características del proceso constructivo. La Construcción sin Pérdidas (Lean Construction) aporta numerosas técnicas asociadas para mejorar el proceso constructivo, y una de ellas es el Sistema del Último Planificador. En este artículo haremos una rápida revisión del estado del arte en cuanto a Métodos de Planificación que se han usado en construcción en el pasado Siglo y en el presente, para concluir que el Sistema del Último Planificador representa una mejora considerable con respecto a los anteriores Sistemas. Se trata de un artículo de opinión y divulgación para fomentar el conocimiento y uso de este Sistema en la construcción española con mayor intensidad.Álvarez-Pérez, MA.; Soler-Severino, M.; Pellicer, E. (2019). An improvement in construction planning: Last Planner System. Building & Management. 3(2):60-70. https://doi.org/10.20868/bma.2019.2.3924S60703

    BIM en la construcción

    Get PDF
    244 páginas.En la actualidad, con la metodología BIM (Building Information Modeling), todos los sistemas de información de los procesos productivos en la obra se han integrado, la información se puede compartir a distancia y en tiempo real con todos los actores involucrados en el proyecto. En estas condiciones, las instituciones generadoras de obras y las empresas prestadoras de servicios se están rediseñando con nuevos modelos de negocios enfocados en satisfacer las actuales demandas y experiencias de los clientes. El libro que aquí se presenta reúne el trabajo de investigación referente a BIM de la Red Académica de Diseño Construcción integrada por académicos de la Facultad de Ingeniería de la Universidad Autónoma de Yucatán, México (UADY), el Worcester Polytechnical Institute (WPI) de Massachusetts, Estados Unidos y del Área de Administración y Tecnología para el Diseño de la Universidad Autónoma Metropolitana, Unidad Azcapotzalco (UAM). También han colaborado con la Red investigadores de la Universidad Politécnica de Madrid (UPM), España y, dentro de la UAM, académicos de la División de Ciencias Básicas e Ingeniería, Departamento de Materiales, del Área de Construcción. Cabe mencionar que los artículos ya han sido publicados con anterioridad en los Anuarios de Administración y Tecnología para el Diseño y las Compilaciones de Artículos de Investigación en Administración y Tecnología para la Arquitectura, Diseño e Ingeniería, productos del trabajo de investigación del Área que edita anualmente desde 1999, como se indica en el índice del presente libro

    Impacte de l’arquitectura i conservació en la reducció de la delinqüència

    No full text
    Analitzant els delictes del Codi Penal, es conclou que el 47,79% de les infraccions penals tenen influència de l’entorn d’on es cometen. Relacionant aquestes 47,79% infraccions amb l’estadística de la criminalitat, es comprova que més del 95% dels delictes comesos a Espanya durant el 2018 i el 2019 van comptar amb la influència de l’espai físic d’on es van produir. L’estudi quantifica la influència de paràmetres arquitectònics amb cadascuna de les fases del delicte (ideació, materialització i fugida/restabliment) i la sensació d’inseguretat. Els paràmetres són extrets de la UNE-EN 14383, la metodologia CPTED i altres autors. Es conclou que tots els paràmetres arquitectònics estudiats influeixen en la seguretat real i percebuda. Són la il·luminació, el manteniment, la visibilitat, les instal·lacions, la façana i els seus buits els més influents en totes les etapes del delicte. A més dels influeixen, a la fase de prevenció les instal·lacions, façana i els seus buits. A la fase de materialització els recorreguts d’evacuació, buits i accessos. I al restabliment/fugida els recorreguts d’evacuació i la distribució interior. L’Arquitectura no és l’únic element influent sobre el delinqüent, però l’article mostra que sí que impacta en gran mesura en la criminalitat. Per això, es proposa utilitzar recursos arquitectònics que incrementin la seguretat real i percebuda. D’aquesta manera, s’incrementaria la seguretat de la víctima potencial i es reduiria la delinqüència.Analyzing the crimes of the Penal Code, it is concluded that 47.79% of the criminal offenses count with influence of the environment of where they are committed. Relating these 47.79% offenses with the crime statistics, it is verified that more than 95% of the crimes committed in Spain during 2018 and 2019 counted with the influence of the physical space of where they occurred. The study quantifies the influence of architectural parameters with each of the phases of the crime (ideation, materialization and escape/establishment) and the feeling of insecurity. The parameters are extracted from UNE-EN 14383, CPTED methodology and other authors. It is concluded that all the architectural parameters studied influence in some way the real and perceived security. Lighting, maintenance, visibility, installations, the façade and its openings are the most influential in all stages of the crime. In the prevention phase, the facilities, facade and their openings are also influential in the prevention phase. In the materialization phase, the evacuation routes, openings and accesses. And in the restoration/escape phase, the evacuation routes and the interior layout. Architecture is not the only element that influences offenders, but the article shows that it does have a major impact on crime. Therefore, it is proposed to use architectural resources that increase real and perceived security. This would increase the security of the potential victim and reduce crime.Analizando los delitos del Código Penal, se concluye que el 47,79% de las infracciones penales cuentan con influencia del entorno de donde se cometen. Relacionando estas 47,79% infracciones con la estadística de la criminalidad, se comprueba que más del 95% de los delitos cometidos en España durante el 2018 y 2019 contaron con la influencia del espacio físico de donde se produjeron. El estudio cuantifica la influencia de parámetros arquitectónicos con cada una de las fases del delito (ideación, materialización y huida/restablecimiento) y la sensación de inseguridad. Los parámetros son extraídos de la UNE-EN 14383, la metodología CPTED y otros autores. Se concluye que todos los parámetros arquitectónicos estudiados influyen de algún modo en la seguridad real y percibida. Son la iluminación, el mantenimiento, la visibilidad, las instalaciones, la fachada y sus huecos los más influyentes en todas las etapas del delito. Además de los influyen, en la fase de prevención las instalaciones, fachada y sus huecos. En la fase de materialización los recorridos de evacuación, huecos y accesos. Y en el restablecimiento/huida los recorridos de evacuación y la distribución interior. La Arquitectura no es el único elemento influyente sobre el delincuente, pero el artículo muestra que sí impacta en gran medida en la criminalidad. Por ello, se propone utilizar recursos arquitectónicos que incrementen la seguridad real y percibida. De esta forma se incrementaría la seguridad de la víctima potencial y se reduciría la delincuencia.Los autores quieren agradecer a los revisores del artículo porque gracias a sus indicaciones el texto ha mejorado.Peer Reviewe
    corecore