12 research outputs found

    DAQExpert - An expert system to increase CMS data-taking efficiency

    No full text
    The efficiency of the Data Acquisition (DAQ) of the Compact Muon Solenoid (CMS) experiment for LHC Run 2 is constantly being improved. A significant factor affecting the data taking efficiency is the experience of the DAQ operator. One of the main responsibilities of the DAQ operator is to carry out the proper recovery procedure in case of failure of data-taking. At the start of Run 2, understanding the problem and finding the right remedy could take a considerable amount of time (up to many minutes). Operators heavily relied on the support of on-call experts, also outside working hours. Wrong decisions due to time pressure sometimes lead to an additional overhead in recovery time. To increase the efficiency of CMS data-taking we developed a new expert system, the DAQExpert, which provides shifters with optimal recovery suggestions instantly when a failure occurs. DAQExpert is a web application analyzing frequently updating monitoring data from all DAQ components and identifying problems based on expert knowledge expressed in small, independent logic-modules written in Java. Its results are presented in real-time in the control room via a web-based GUI and a sound-system in a form of short description of the current failure, and steps to recover

    The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    No full text
    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of 7.5 × 10 34 cm⁻² s⁻¹ (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. In this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ "data center" are analysed. Emerging technologies for data reduction are considered. Novel possible approaches to event building and online processing, inspired by trending developments in other areas of computing dealing with large masses of data, are also examined. We conclude by discussing the opportunities offered by reading out and processing parts of the detector, wherever the front-end electronics allows, at the machine clock rate (40 MHz). This idea presents interesting challenges and its physics potential should be studied

    New operator assistance features in the CMS Run Control System

    No full text
    During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured with new parameters. Certain types of errors such as errors caused by single-event upsets may trigger an automatic recovery procedure. Furthermore, the top-level control node continuously performs cross-checks to detect sub-system actions becoming necessary because of changes in configuration keys, changes in the set of included front-end drivers or because of potential clock instabilities. The operator is guided to perform the necessary actions through graphical indicators displayed next to the relevant command buttons in the user interface. Through these indicators, consistent configuration of CMS is ensured. However, manually following the indicators can still be inefficient at times. A new assistant to the operator has therefore been developed that can automatically perform all the necessary actions in a streamlined order. If additional problems arise, the new assistant tries to automatically recover from these. With the new assistant, a run can be started from any state of the sub-systems with a single click. An ongoing run may be recovered with a single click, once the appropriate recovery action has been selected. We review the automation features of CMS Run Control and discuss the new assistant in detail including first operational experience

    Performance of the CMS Event Builder

    No full text
    The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider assembles events at a rate of 100 kHz, transporting event data at an aggregate throughput of to the high-level trigger farm. The DAQ architecture is based on state-of-the-art network technologies for the event building. For the data concentration, 10/40 Gbit/s Ethernet technologies are used together with a reduced TCP/IP protocol implemented in FPGA for a reliable transport between custom electronics and commercial computing hardware. A 56 Gbit/s Infiniband FDR Clos network has been chosen for the event builder. This paper presents the implementation and performance of the event-building system

    The DAQ and control system for the CMS Phase-1 pixel detector upgrade

    Get PDF
    Abstract: In 2017 a new pixel detector was installed in the CMS detector. This so-called Phase-1 pixel detector features four barrel layers in the central region and three disks per end in the forward regions. The upgraded pixel detector requires an upgraded data acquisition (DAQ) system to accept a new data format and larger event sizes. A new DAQ and control system has been developed based on a combination of custom and commercial microTCA parts. Custom mezzanine cards on standard carrier cards provide a front-end driver for readout, and two types of front-end controller for configuration and the distribution of clock and trigger signals. Before the installation of the detector the DAQ system underwent a series of integration tests, including readout of the pilot pixel detector, which was constructed with prototype Phase-1 electronics and operated in CMS from 2015 to 2016, quality assurance of the CMS Phase-1 detector during its assembly, and testing with the CMS Central DAQ. This paper describes the Phase-1 pixel DAQ and control system, along with the integration tests and results. A description of the operational experience and performance in data taking is included
    corecore