979 research outputs found

    Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

    Get PDF
    As one result of the project "Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation", a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers

    Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

    Get PDF
    As one result of the project "Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation", a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers

    Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

    Get PDF
    As one result of the project "Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation", a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers

    Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling

    Get PDF
    As one result of the project "Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation", a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers

    {Bis[2-(diphenyl­phosphan­yl)phen­yl] ether-κ2 P,P′}(1,1′-dibenz­yl-1H,1′H-4,4′bi-1,2,3-triazole-κ2 N3,N 3′)copper(I) hexa­fluorido­phosphate dichloro­methane hemisolvate

    Get PDF
    In the crystal structure of the title compound, [Cu(C18H16N6)(C36H28OP2)]PF6·0.5CH2Cl2 or [Cu(DPEPhos)(Bn-bta)]PF6·0.5CH2Cl2 {DPEPhos = bis­[(diphenyl­phosphan­yl)phen­yl] ether and Bn-bta = 1,1′-dibenzyl-1H,1′H-4,4′-bi-1,2,3triazol­e}, the Cu atom is coordinated by two N and two P atoms of the ligands in a strongly distorted tetra­hedral environment. There are two crystallographically independent complex cations present, which differ significantly in their geometrical parameters. The solvent molecule is disordered but satisfactory atomic positions could not be determined

    \u3ci\u3eIn-situ\u3c/i\u3e-Investigation of Enzyme Immobilization on Polymer Brushes

    Get PDF
    Herein, we report on the use of a combined setup of quartz-crystal microbalance, with dissipation monitoring and spectroscopic ellipsometry, to comprehensively investigate the covalent immobilization of an enzyme to a polymer layer. All steps of the covalent reaction of the model enzyme glucose oxidase with the poly(acrylic acid) brush by carbodiimide chemistry, were monitored in-situ. Data were analyzed using optical and viscoelastic modeling. A nearly complete collapse of the polymer chains was found upon activation of the carboxylic acid groups with N-(3-Dimethylaminopropyl)-N′-ethylcarbodiimide and N-Hydroxysuccinimide. The reaction with the amine groups of the enzyme occurs simultaneously with re-hydration of the polymer layer. Significantly more enzyme was immobilized on the surface compared to physical adsorption at similar conditions, at the same pH. It was found that the pH responsive swelling behavior was almost not affected by the presence of the enzyme
    • …
    corecore