1,282 research outputs found

    Uniqueness of blowup at singular points for superconductivity problem

    Full text link
    In this paper, we prove that the uniqueness of blowup at the maximum point of coincidence set of the superconductivity problem, mainly based on the Weiss-type and Monneau-type monotonicity formulas, and the proof of the main results in this paper is inspired the recent paper \cite{CFL22} by Chen-Feng-Li

    Comparison of Copper Leaching from Alkaline Copper Quat Type-D Treated Chinese Fir and Mongolian Scots Pine after Different Posttreatments

    Get PDF
    Chinese fir (Cunninghamia lanceolata Hook.) and Mongolian Scots pine (Pinus sylvestris Linn. var. mongolica Litv.) sapwood were treated with alkaline copper quat type D (ACQ-D) solutions at two concentration levels (0.5 and 1.1%) followed by three posttreatments: oven-drying, conditioning in a humidity chamber, or exposed to boiling water. The effects of treatment on copper leaching from ACQ-D-treated wood were investigated by performing tests according to AWPA E11-06. Analysis of chemical composition and pH values were determined to evaluate the effects of wood species on copper leaching. The results showed that copper leaching from ACQ-D-treated Mongolian Scots pine without posttreatment was lower than that of treated Chinese fir. However, after posttreatment, more copper leaching was observed from ACQ-D-treated Mongolian Scots pine than Chinese fir. For example, after conditioning posttreatment, the percentage of copper leached from 1.1% ACQ-D-treated Chinese fir decreased 58.6 to 1.8%, while for Mongolian Scots pine, it decreased 49.5 to 19.4%. The difference was considered to be related to different chemical compositions and pH levels

    Joint Power and Multiple Access Control for Wireless Mesh Network with Rose Projection Method

    Get PDF
    This paper investigates the utility maximization problem for the downlink of the multi-interface multichannel wireless mesh network with orthogonal frequency division multiple access. A cross-layer joint power and multiple access control algorithm are proposed. Rosen projection matrix is combined with Solodov projection techniques to build a three-memory gradient Rosen projection method, which is applied to solve this optimization problem. The convergence analysis is given and simulations show that the proposed solution achieves significant throughput compared with existing approaches

    On the performance of existing acoustic energy models when applied to multi-purpose performance halls

    Get PDF
    Acoustical measurements were done in two multi-purpose performance halls in the present study. The measured data are compared with predictions from three acoustic energy models in existing literature derived for churches and large reverberant theatres. Results show that the model suitable for the present multi-purpose performance halls is the one which takes into account the time difference between direct sound arrival and onset time of reverberant sound decay. However, unlike the church cases, the time difference appears to have no direct definite relationship with the source-receiver distance alone. A method for the prediction of time difference is then proposed for multi-purpose performance hall application. In addition, the prediction of the late reflected energy is not satisfactory, and this deficiency is the main problem leading to the inaccurate estimation of clarity, definition and centre time in the present study

    Multi-stage sizing approach for development of utility-scale BESS considering dynamic growth of distributed photovoltaic connection

    Get PDF
    The battery energy storage system (BESS) is regarded as one of the most promising address operational challenges caused by distributed generations. This paper proposes a novel multi-stage sizing model for utility-scale BESS, to optimize the BESS development strategies for distribution networks with increasing penetration levels and growth patterns of dispersed photovoltaic (PV) panels. Particularly, an integrated model is established in order to accommodate dispersed PVs in short-term operation scale while facilitating appropriate profits in long-term planning scale. Clusterwise reduction is adopted to extract the most representative operating scenarios with PVs and BESS integration, which is able to decrease the computing complexity caused by scenario redundancy. The numerical studies on IEEE 69-bus distribution system verify the feasibility of the proposed multi-stage sizing approach for the utility-scale BESS.</p
    corecore