16 research outputs found
ΠΠ»Π΅ΠΊΡΡΠΎΠΌΠ΅Ρ Π°Π½ΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΠΏΡΠ΅ΠΎΠ±ΡΠ°Π·ΠΎΠ²Π°ΡΠ΅Π»ΠΈ ΡΠ½Π΅ΡΠ³ΠΈΠΈ: ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π»Ρ VII ΠΠ΅ΠΆΠ΄ΡΠ½Π°ΡΠΎΠ΄Π½ΠΎΠΉ Π½Π°ΡΡΠ½ΠΎ-ΡΠ΅Ρ Π½ΠΈΡΠ΅ΡΠΊΠΎΠΉ ΠΊΠΎΠ½ΡΠ΅ΡΠ΅Π½ΡΠΈΠΈ, 14-16 ΠΎΠΊΡΡΠ±ΡΡ 2015 Π³., Π³. Π’ΠΎΠΌΡΠΊ
Π‘Π±ΠΎΡΠ½ΠΈΠΊ ΡΠΎΠ΄Π΅ΡΠΆΠΈΡ Π΄ΠΎΠΊΠ»Π°Π΄Ρ Π½Π° VII ΠΠ΅ΠΆΠ΄ΡΠ½Π°ΡΠΎΠ΄Π½ΠΎΠΉ Π½Π°ΡΡΠ½ΠΎ-ΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΎΠΉ ΠΊΠΎΠ½ΡΠ΅ΡΠ΅Π½ΡΠΈΠΈ Β«ΠΠ»Π΅ΠΊΡΡΠΎΠΌΠ΅Ρ
Π°Π½ΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΠΏΡΠ΅ΠΎΠ±ΡΠ°Π·ΠΎΠ²Π°ΡΠ΅Π»ΠΈ ΡΠ½Π΅ΡΠ³ΠΈΠΈΒ». Π’Π΅ΠΌΡ ΡΠ°Π±ΠΎΡ ΠΎΠ±ΡΠ΅Π΄ΠΈΠ½Π΅Π½Ρ Π² 5 Π³ΡΡΠΏΠΏ ΠΈ ΠΎΡ
Π²Π°ΡΡΠ²Π°ΡΡ Π°ΠΊΡΡΠ°Π»ΡΠ½ΡΠ΅ ΠΏΡΠΎΠ±Π»Π΅ΠΌΡ ΡΠΎΠ²ΡΠ΅ΠΌΠ΅Π½Π½ΠΎΠΉ ΡΠ»Π΅ΠΊΡΡΠΎΠΌΠ΅Ρ
Π°Π½ΠΈΠΊΠΈ ΠΈ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π΅ΡΠ³Π΅ΡΠΈΠΊΠΈ. Π Π½ΠΈΡ
ΠΏΡΠΈΠ²ΠΎΠ΄ΡΡΡΡ ΡΠ΅Π·ΡΠ»ΡΡΠ°ΡΡ ΡΠ΅ΠΎΡΠ΅ΡΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΈ ΡΠΊΡΠΏΠ΅ΡΠΈΠΌΠ΅Π½ΡΠ°Π»ΡΠ½ΡΡ
ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΠΉ ΡΠ»Π΅ΠΊΡΡΠΎΠΌΠ΅Ρ
Π°Π½ΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΏΡΠ΅ΠΎΠ±ΡΠ°Π·ΠΎΠ²Π°ΡΠ΅Π»Π΅ΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ ΠΈ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΊΠΎΠΌΠΏΠ»Π΅ΠΊΡΠΎΠ². ΠΡΠ΄Π΅Π»ΡΠ½ΡΠΉ ΡΠ°Π·Π΄Π΅Π» ΠΏΠΎΡΠ²ΡΡΠ΅Π½ Π²ΠΎΠΏΡΠΎΡΠ°ΠΌ ΠΏΠΎΠ΄Π³ΠΎΡΠΎΠ²ΠΊΠΈ ΠΈΠ½ΠΆΠ΅Π½Π΅ΡΠ½ΡΡ
ΠΈ Π½Π°ΡΡΠ½ΡΡ
ΠΊΠ°Π΄ΡΠΎΠ² Π² ΠΎΠ±Π»Π°ΡΡΠΈ ΡΠ»Π΅ΠΊΡΡΠΎΠΌΠ΅Ρ
Π°Π½ΠΈΠΊΠΈ ΠΈ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π΅ΡΠ³Π΅ΡΠΈΠΊΠΈ. Π ΡΡΠ΄Π΅ Π΄ΠΎΠΊΠ»Π°Π΄ΠΎΠ² Π½Π°ΡΠ»ΠΈ ΠΎΡΡΠ°ΠΆΠ΅Π½ΠΈΠ΅ Π²ΠΎΠΏΡΠΎΡΡ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΎΠ³ΠΎ ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π»ΠΎΠ²Π΅Π΄Π΅Π½ΠΈΡ ΠΈ ΠΎΠ±Π΅ΡΠΏΠ΅ΡΠ΅Π½ΠΈΡ Π½Π°Π΄Π΅ΠΆΠ½ΠΎΡΡΠΈ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΈΡ
ΡΡΡΡΠΎΠΉΡΡΠ²
Status of the HZB ERL Prototype bERLinPro
The Berlin Energy Recovery Linac Prototype BERLinPro is to be constructed at the Helmholtz Zentrum site in Berlin. The aim of the project is to expand the required accelerator physics and technology knowledge mandatory for the generation of a high current 100 mA , high brilliance norm. emittance below 1 mm mrad cw electron beam. Since the funding decision in October 2010 the project has entered a phase of detailed planning. Hardware specifications have been defined and various components have been ordered. Furthermore, extensive tests of principal superconducting accelerator components successfully demonstrated the envisaged hardware performance. A summary of the most recent activities together with the details of the project timeline for the coming years are given in this pape