101,251 research outputs found
Estimating, planning and managing Agile Web development projects under a value-based perspective
Context: The processes of estimating, planning and managing are crucial for software development projects,
since the results must be related to several business strategies. The broad expansion of the Internet
and the global and interconnected economy make Web development projects be often characterized by
expressions like delivering as soon as possible, reducing time to market and adapting to undefined
requirements. In this kind of environment, traditional methodologies based on predictive techniques
sometimes do not offer very satisfactory results. The rise of Agile methodologies and practices has
provided some useful tools that, combined with Web Engineering techniques, can help to establish a
framework to estimate, manage and plan Web development projects.
Objective: This paper presents a proposal for estimating, planning and managing Web projects, by
combining some existing Agile techniques with Web Engineering principles, presenting them as an
unified framework which uses the business value to guide the delivery of features.
Method: The proposal is analyzed by means of a case study, including a real-life project, in order to obtain
relevant conclusions.
Results: The results achieved after using the framework in a development project are presented, including
interesting results on project planning and estimation, as well as on team productivity throughout the
project.
Conclusion: It is concluded that the framework can be useful in order to better manage Web-based
projects, through a continuous value-based estimation and management process.Ministerio de Economía y Competitividad TIN2013-46928-C3-3-
Agile in Public Administration: Oxymoron or reality? An experience report
In the last 10 years, Agile methods and practices have emerged as an
alternative for software development. Different "flavors" of Agile have
appeared ranging from project management to tests organization. These
approaches have being gaining popularity and involve now a solid option for
organizations developing software, but what about Public Administrations? Is
Agile a suitable option for developing software in Public Administrations?
Even if Public Administrations have been traditionally regarded as changeresistant,
Agile approach can also provide them with the benefits of quick
adaptation and frequent value delivery.
This paper presents the results of two different projects, which use an Agile
framework based on Scrum, developed by a Spanish Public Administration.
Additionally, after considering the obtained results, it takes out some relevant
learned lessons on the suitability of applying Agile approaches to Public
Administration environments.Ministerio de Ciencia e Innovación TIN2010-20057-C03-02Junta de Andalucía TIC-578
Integrating automated support for a software management cycle into the TAME system
Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system
On the use of schedule risk analysis for project management
The purpose of this paper is to give an overview on the existing literature and recent developments on the research on Schedule Risk Analysis (SRA) in Project Management (PM) to measure the sensitivity of activities and resources in the project network. SRA is a technique that relies on Monte-Carlo simulation runs to analyze the impact of changes in activity durations and costs on the overall project time and cost objectives. First, the paper gives an overview of the most commonly known sensitivity metrics from literature that are widely used by PM software tools to measure the time and cost sensitivity of activities as well as sensitivity for project resources. Second, the relevance of these metrics in an integrated project control setting is discussed based on some recent research studies. Finally, a short discussion on the challenges for future research is given. All sections in this paper are based on research studies done in the past
for which references will be given throughout the manuscript
- …