174,384 research outputs found

    An innovative mobile application for construction programme managers

    Get PDF
    Construction programme management is a complex and information-intensive environment. The construction programme management team requires access to construction information in real-time and when needed. The current increasing use of mobile devices offers an opportunity to meet this need. The efficient management of construction programmes is one of the major factors for improving stakeholders’ satisfaction. An innovative tool is needed in accessing the right information at the right time, especially when spontaneous and urgent decision-making is needed. To this end, the innovative use of a mobile device in delivering information and services to the management team in real-time and based on their current context offers significant benefits. This paper discusses context-aware computing, the enabling technologies for geolocation and the development of a prototype, mobile, context-aware application for construction programme management. The prototype system developed is based on the findings from an earlier study of user requirements which showed that the ability to provide relevant information and services at an appropriate time and at the most appropriate location has the potential to improve the monitoring and control of construction programmes. The prototype system demonstrates the provision of context-specific information and services to construction programme managers using a mobile device. The benefits and limitations of the proposed approach are discussed and conclusions drawn about the potential impact of enhanced information delivery for the efficiency of the construction programme managers

    Formulating the cognitive design problem of air traffic management

    Get PDF
    Evolutionary approaches to cognitive design in the air traffic management (ATM) system can be attributed with a history of delayed developments. This issue is well illustrated in the case of the flight progress strip where attempts to design a computer-based system to replace the paper strip have consistently been met with rejection. An alternative approach to cognitive design of air traffic management is needed and this paper proposes an approach centred on the formulation of cognitive design problems. The paper gives an account of how a cognitive design problem was formulated for a simulated ATM task performed by controller subjects in the laboratory. The problem is formulated in terms of two complimentary models. First, a model of the ATM domain describes the cognitive task environment of managing the simulated air traffic. Second, a model of the ATM worksystem describes the abstracted cognitive behaviours of the controllers and their tools in performing the traffic management task. Taken together, the models provide a statement of worksystem performance, and express the cognitive design problem for the simulated system. The use of the problem formulation in supporting cognitive design, including the design of computer-based flight strips, is discussed

    Integrated quality and enhancement review : summative review : South Birmingham College

    Get PDF

    Integrating IVHM and Asset Design

    Get PDF
    Integrated Vehicle Health Management (IVHM) describes a set of capabilities that enable effective and efficient maintenance and operation of the target vehicle. It accounts for the collection of data, conducting analysis, and supporting the decision-making process for sustainment and operation. The design of IVHM systems endeavours to account for all causes of failure in a disciplined, systems engineering, manner. With industry striving to reduce through-life cost, IVHM is a powerful tool to give forewarning of impending failure and hence control over the outcome. Benefits have been realised from this approach across a number of different sectors but, hindering our ability to realise further benefit from this maturing technology, is the fact that IVHM is still treated as added on to the design of the asset, rather than being a sub-system in its own right, fully integrated with the asset design. The elevation and integration of IVHM in this way will enable architectures to be chosen that accommodate health ready sub-systems from the supply chain and design trade-offs to be made, to name but two major benefits. Barriers to IVHM being integrated with the asset design are examined in this paper. The paper presents progress in overcoming them, and suggests potential solutions for those that remain. It addresses the IVHM system design from a systems engineering perspective and the integration with the asset design will be described within an industrial design process

    A new governance approach for multi-firm projects: lessons from Olkiluoto 3 and Flamanville 3 nuclear power plant projects

    Get PDF
    We analyze governance in two contemporary nuclear power plant projects: Olkiluoto 3 (Finland) and Flamanville 3 (France). We suggest that in the governance of large multi-firm projects, any of the prevalent governance approaches that rely on market, hierarchy, or hybrid forms, is not adequate as such. This paper opens up avenues towards a novel theory of governance in large projects by adopting a project network view with multiple networked firms within a single project, and by simultaneously going beyond organizational forms that cut across the traditional firm–market dichotomy. Our analysis suggests four changes in the prevailing perspective towards the governance of large projects. First, there should be a shift from viewing multi-firm projects as hierarchical contract organizations to viewing them as supply networks characterized by a complex and networked organizational structure. Second, there should be a shift in the emphasis of the predominant modes of governance, market and hierarchy towards novel governance approaches that emphasize network-level mechanisms such as self-regulation within the project. Third, there should be a shift from viewing projects as temporary endeavors to viewing projects as short-term events or episodes embedded in the long-term sphere of shared history and expected future activities among the involved actors. Fourth, there should be a shift from the prevailing narrow view of a hierarchical project management system towards an open system view of managing in complex and challenging institutional environments

    Reforming project management: the role of lean construction

    Get PDF
    Project management as taught by professional societies and applied in current practice must be reformed because it is inadequate today and its performance will continue to decline as projects become more uncertain, complex and pressed for speed. Project management is failing because of flawed assumptions and idealized theory: it rests on a faulty understanding of the nature or work in projects, and a deficient definition of control. It is argued that a reform of project management will be driven by theories from production management that add the management of workflow and the creation and delivery of value to the current emphasis on activities. Of all the approaches to production management, the theory and principles drawn from Lean Production seem to be best suited for project management. Promising results in this regard have been reached already in one project management area, namely in Lean Construction

    Integrating IVHM and asset design

    Get PDF
    Integrated Vehicle Health Management (IVHM) describes a set of capabilities that enable effective and efficient maintenance and operation of the target vehicle. It accounts for the collecting of data, conducting analysis, and supporting the decision-making process for sustainment and operation. The design of IVHM systems endeavours to account for all causes of failure in a disciplined, systems engineering, manner. With industry striving to reduce through-life cost, IVHM is a powerful tool to give forewarning of impending failure and hence control over the outcome. Benefits have been realised from this approach across a number of different sectors but, hindering our ability to realise further benefit from this maturing technology, is the fact that IVHM is still treated as added on to the design of the asset, rather than being a sub-system in its own right, fully integrated with the asset design. The elevation and integration of IVHM in this way will enable architectures to be chosen that accommodate health ready sub-systems from the supply chain and design trade-offs to be made, to name but two major benefits. Barriers to IVHM being integrated with the asset design are examined in this paper. The paper presents progress in overcoming them, and suggests potential solutions for those that remain. It addresses the IVHM system design from a systems engineering perspective and the integration with the asset design will be described within an industrial design process

    Integrated quality and enhancement review : summative review : the College of West Anglia

    Get PDF

    Integrated quality and enhancement review : summative review : Leicester College

    Get PDF
    • …
    corecore