19,409 research outputs found

    Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector

    Get PDF
    This is an accepted manuscript of an article published by Emerald in Journal of Engineering, Design and Technology on 09/05/2020: https://doi.org/10.1108/JEDT-01-2020-0007 The accepted version of the publication may differ from the final published version.Purpose The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects. Design/methodology/approach To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework. Findings Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information. Practical implications This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required. Originality/value By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented

    Preliminary Results in a Multi-site Empirical Study on Cross-organizational ERP Size and Effort Estimation

    Get PDF
    This paper reports on initial findings in an empirical study carried out with representatives of two ERP vendors, six ERP adopting organizations, four ERP implementation consulting companies, and two ERP research and advisory services firms. Our study’s goal was to gain understanding of the state-of-the practice in size and effort estimation of cross-organizational ERP projects. Based on key size and effort estimation challenges identified in a previously published literature survey, we explored some difficulties, fallacies and pitfalls these organizations face. We focused on collecting empirical evidence from the participating ERP market players to assess specific facts about the state-of-the-art ERP size and effort estimation practices. Our study adopted a qualitative research method based on an asynchronous online focus group

    Sensemaking Practices in the Everyday Work of AI/ML Software Engineering

    Get PDF
    This paper considers sensemaking as it relates to everyday software engineering (SE) work practices and draws on a multi-year ethnographic study of SE projects at a large, global technology company building digital services infused with artificial intelligence (AI) and machine learning (ML) capabilities. Our findings highlight the breadth of sensemaking practices in AI/ML projects, noting developers' efforts to make sense of AI/ML environments (e.g., algorithms/methods and libraries), of AI/ML model ecosystems (e.g., pre-trained models and "upstream"models), and of business-AI relations (e.g., how the AI/ML service relates to the domain context and business problem at hand). This paper builds on recent scholarship drawing attention to the integral role of sensemaking in everyday SE practices by empirically investigating how and in what ways AI/ML projects present software teams with emergent sensemaking requirements and opportunities

    Industry-driven innovative system development for the construction industry: The DIVERCITY project

    Get PDF
    Collaborative working has become possible using the innovative integrated systems in construction as many activities are performed globally with stakeholders situated in various locations. The Integrated VR based information systems can bind the fragmentation and provide communication and collaboration between the distributed stakeholders n various locations. The development of these technologies is vital for the uptake of these systems by the construction industry. This paper starts by emphasising the importance of construction IT research and reviews some future research directions in this area. In particular, the paper explores how virtual prototyping can improve the productivity and effectiveness of construction projects, and presents DIVERCITY, which is th as a case study of the research in virtual prototyping. Besides, the paper explores the requirements engineering of the DIVERCITY project. DIVERCITY has large and evolving requirements, which considered the perspectives of multiple stakeholders, such as clients, architects and contractors. However, practitioners are often unsure of the detail of how virtual environments would support the construction process, and how to overcome some barriers to the introduction of new technologies. This complicates the requirements engineering process

    The changing perception in the artefacts used in the design practice through BIM adoption

    Get PDF
    When CAD (Computer Aided Design) was generally adopted in the early 1990’s, the hand drawn process was replaced with the CAD drawing but the nature of the artefacts / deliverables and the exchanges of information between disciplines remained fundamentally the same. The deliverables remained 2D representations of 3D forms and Specifications and Bill of Quantities. However, the building industry is under great pressure to provide value for money, sustainable design and construction. This has propelled the adoption of Building Information Modelling (BIM). BIM is a foundational tool for a team based lean design approach. It can enable the intelligent interrogation of design; provide a quicker and cheaper design production; better co-ordination of documentation; more effective change control; less repetition of processes; a better quality constructed product; and improved communication both for the architectural practice and across the supply chain. As BIM enables a new of working methodology, it entails the change in perceiving artefacts used and deliverables produced in the design and construction stages. In other words, defining what the informational issues are, who does what and who is responsible for what and the level of detail required at each stage in design and construction is critically important to adopt and implement BIM in the construction sector. This paper presents the key findings through the action research methodology about the change in the nature of artefacts and deliverables resulting from the BIM adoption in the KTP (Knowledge Transfer Partnership) project undertaken by the University of Salford and John McCall Architects

    Exploiting a Goal-Decomposition Technique to Prioritize Non-functional Requirements

    Get PDF
    Business stakeholders need to have clear and realistic goals if they want to meet commitments in application development. As a consequence, at early stages they prioritize requirements. However, requirements do change. The effect of change forces the stakeholders to balance alternatives and reprioritize requirements accordingly. In this paper we discuss the problem of priorities to non-functional requirements subjected to change. We, then, propose an approach to help smooth the impact of such changes. Our approach favors the translation of nonoperational specifications into operational definitions that can be evaluated once the system is developed. It uses the goal-question-metric method as the major support to decompose non-operational specifications into operational ones. We claim that the effort invested in operationalizing NFRs helps dealing with changing requirements during system development. Based on\ud this transformation and in our experience, we provide guidelines to prioritize volatile non-functional requirements

    Examining perceptions of agility in software development practice

    Get PDF
    This is the post-print version of the final published article that is available from the link below. Copyright @ 2010 ACM.Organizations undertaking software development are often reminded that successful practice depends on a number of non-technical issues that are managerial, cultural and organizational in nature. These issues cover aspects from appropriate corporate structure, through software process development and standardization to effective collaborative practice. Since the articulation of the 'software crisis' in the late-1960s, significant effort has been put into addressing problems related to the cost, time and quality of software development via the application of systematic processes and management practices for software engineering. Early efforts resulted in prescriptive structured methods, which have evolved and expanded over time to embrace consortia/ company-led initiatives such as the Unified Modeling Language and the Unified Process alongside formal process improvement frameworks such as the International Standards Organization's 9000 series, the Capability Maturity Model and SPICE. More recently, the philosophy behind traditional plan-based initiatives has been questioned by the agile movement, which seeks to emphasize the human and craft aspects of software development over and above the engineering aspects. Agile practice is strongly collaborative in its outlook, favoring individuals and interactions over processes and tools, working software over comprehensive documentation, customer collaboration over contract negotiation, and responding to change over following a plan (see Sidebar 1). Early experience reports on the use of agile practice suggest some success in dealing with the problems of the software crisis, and suggest that plan-based and agile practice are not mutually exclusive. Indeed, flexibility may arise from this unlikely marriage in an aim to strike a balance between the rigor of traditional plan-based approaches and the need for adaptation of those to suit particular development situations. With this in mind, this article surveys the current practice in software engineering alongside perceptions of senior development managers in relation to agile practice in order to understand the principles of agility that may be practiced implicitly and their effects on plan-based approach
    • …
    corecore