35 research outputs found

    Simulation Optimization for the Stochastic Economic Lot Scheduling Problem with Sequence-Dependent Setup Times

    Get PDF
    We consider the stochastic economic lot scheduling problem (SELSP) with lost sales and random demand, where switching between products is subject to sequence-dependent setup times. We propose a solution based on simulation optimization using an iterative two-step procedure which combines global policy search with local search heuristics for the traveling salesman sequencing subproblem. To optimize the production cycle, we compare two criteria: minimizing total setup times and evenly distributing setups to obtain a more regular production cycle. Based on a numerical study, we find that a policy with a balanced production cycle leads to lower cost than other policies with unbalanced cycles. (authors' abstract

    Production planning mechanisms in demand-driven wood remanufacturing industry

    Get PDF
    L'objectif principal de cette thèse est d'étudier le problème de planification de la production dans le contexte d'une demande incertaine, d’un niveau de service variable et d’approvisionnements incontrôlables dans une usine de seconde transformation du bois. Les activités de planification et de contrôle de production sont des tâches intrinsèquement complexes et difficiles pour les entreprises de seconde transformation du bois. La complexité vient de certaines caractéristiques intrinsèques de cette industrie, comme la co-production, les procédés alternatifs divergents, les systèmes de production sur commande (make-to-order), des temps de setup variables et une offre incontrôlable. La première partie de cette thèse propose une plate-forme d'optimisation/simulation permettant de prendre des décisions concernant le choix d'une politique de planification de la production, pour traiter rapidement les demandes incertaines, tout en tenant compte des caractéristiques complexes de l'industrie de la seconde transformation du bois. À cet effet, une stratégie de re-planification périodique basée sur un horizon roulant est utilisée et validée par un modèle de simulation utilisant des données réelles provenant d'un partenaire industriel. Dans la deuxième partie de cette thèse, une méthode de gestion des stocks de sécurité dynamique est proposée afin de mieux gérer le niveau de service, qui est contraint par une capacité de production limitée et à la complexité de la gestion des temps de mise en course. Nous avons ainsi développé une approche de re-planification périodique à deux phases, dans laquelle des capacités non-utilisées (dans la première phase) sont attribuées (dans la seconde phase) afin de produire certains produits jugés importants, augmentant ainsi la capacité du système à atteindre le niveau de stock de sécurité. Enfin, dans la troisième partie de la thèse, nous étudions l’impact d’un approvisionnement incontrôlable sur la planification de la production. Différents scénarios d'approvisionnement servent à identifier les seuils critiques dans les variations de l’offre. Le cadre proposé permet aux gestionnaires de comprendre l'impact de politiques d'approvisionnement proposées pour faire face aux incertitudes. Les résultats obtenus à travers les études de cas considérés montrent que les nouvelles approches proposées dans cette thèse constituent des outils pratiques et efficaces pour la planification de production du bois.The main objective of this thesis is to investigate the production planning problem in the context of uncertain demand, variable service level, and uncontrollable supply in a wood remanufacturing mill. Production planning and control activities are complex and represent difficult tasks for wood remanufacturers. The complexity comes from inherent characteristics of the industry such as divergent co-production, alternative processes, make-to-order, short customer lead times, variable setup time, and uncontrollable supply. The first part of this thesis proposes an optimization/simulation platform to make decisions about the selection of a production planning policy to deal swiftly with uncertain demands, under the complex characteristics of the wood remanufacturing industry. For this purpose, a periodic re-planning strategy based on a rolling horizon was used and validated through a simulation model using real data from an industrial partner. The computational results highlighted the significance of using the re-planning model as a practical tool for production planning under unstable demands. In the second part, a dynamic safety stock method was proposed to better manage service level, which was threatened by issues related to limited production capacity and the complexity of setup time. We developed a two-phase periodic re-planning approach whereby idle capacities were allocated to produce more important products thus increasing the realization of safety stock level. Numerical results indicated that the solution of the two-phase method was superior to the initial method in terms of backorder level as well as inventory level. Finally, we studied the impact of uncontrollable supply on demand-driven wood remanufacturing production planning through an optimization and simulation framework. Different supply scenarios were used to identify the safety threshold of supply changes. The proposed framework provided managers with a novel advanced planning approach that allowed understanding the impact of supply policies to deal with uncertainties. In general, the wood products industry offers a rich environment for dealing with uncertainties for which the literature fails to provide efficient solutions. Regarding the results that were obtained through the case studies, we believe that approaches proposed in this thesis can be considered as novel and practical tools for wood remanufacturing production planning

    An investigation of production and transportation policies for multi-item and multi-stage production systems

    Get PDF
    Die vorliegende kumulative Dissertation besteht aus fünf Artikeln, einem Arbeitspapier und vier Artikeln, die in wissenschaftlichen Zeitschriften veröffentlicht wurden. Alle fünf Artikel beschäftigen sich mit der Losgrößenplanung, jedoch mit unterschiedlichen Schwerpunkten. Artikel 1 bis 4 untersuchen das Economic Lot Scheduling Problem (ELSP), während sich der fünfte Artikel mit einer Variante des Joint Economic Lot Size (JELS) Problems beschäftigt. Die Struktur dieser Dissertation trägt diesen beiden Forschungsrichtungen Rechnung und ordnet die ersten vier Artikel dem Teil A und den fünften Artikel dem Teil B zu
    corecore