12,081 research outputs found
Project scheduling under undertainty – survey and research potentials.
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;
A hyper-heuristic for adaptive scheduling in computational grids
In this paper we present the design and implementation of an hyper-heuristic for efficiently scheduling independent jobs in computational grids. An efficient scheduling of jobs to grid resources depends on many parameters, among others, the characteristics of the resources and jobs (such as computing capacity, consistency of computing, workload, etc.). Moreover, these characteristics change over time due to the dynamic nature of grid environment, therefore the planning of jobs to resources should be adaptively done. Existing ad hoc scheduling methods (batch and immediate mode) have shown their efficacy for certain types of resource and job characteristics. However, as stand alone methods, they are not able to produce the best planning of jobs to resources for different types of Grid resources and job characteristics. In this work we have designed and implemented a hyper-heuristic that uses a set of ad hoc (immediate and batch mode) scheduling methods to provide the scheduling of jobs to Grid resources according to the Grid and job characteristics. The hyper-heuristic is a high level algorithm, which examines the state and characteristics of the Grid system (jobs and resources), and selects and applies the ad hoc method that yields the best planning of jobs. The resulting hyper-heuristic based scheduler can be thus used to develop network-aware applications that need efficient planning of jobs to resources. The hyper-heuristic has been tested and evaluated in a dynamic setting through a prototype of a Grid simulator. The experimental evaluation showed the usefulness of the hyper-heuristic for planning of jobs to resources as compared to planning without knowledge of the resource and job characteristics.Peer ReviewedPostprint (author's final draft
Design and Analysis of an Estimation of Distribution Approximation Algorithm for Single Machine Scheduling in Uncertain Environments
In the current work we introduce a novel estimation of distribution algorithm
to tackle a hard combinatorial optimization problem, namely the single-machine
scheduling problem, with uncertain delivery times. The majority of the existing
research coping with optimization problems in uncertain environment aims at
finding a single sufficiently robust solution so that random noise and
unpredictable circumstances would have the least possible detrimental effect on
the quality of the solution. The measures of robustness are usually based on
various kinds of empirically designed averaging techniques. In contrast to the
previous work, our algorithm aims at finding a collection of robust schedules
that allow for a more informative decision making. The notion of robustness is
measured quantitatively in terms of the classical mathematical notion of a norm
on a vector space. We provide a theoretical insight into the relationship
between the properties of the probability distribution over the uncertain
delivery times and the robustness quality of the schedules produced by the
algorithm after a polynomial runtime in terms of approximation ratios
AI and OR in management of operations: history and trends
The last decade has seen a considerable growth in the use of Artificial Intelligence (AI) for operations management with the aim of finding solutions to problems that are increasing in complexity and scale. This paper begins by setting the context for the survey through a historical perspective of OR and AI. An extensive survey of applications of AI techniques for operations management, covering a total of over 1200 papers published from 1995 to 2004 is then presented. The survey utilizes Elsevier's ScienceDirect database as a source. Hence, the survey may not cover all the relevant journals but includes a sufficiently wide range of publications to make it representative of the research in the field. The papers are categorized into four areas of operations management: (a) design, (b) scheduling, (c) process planning and control and (d) quality, maintenance and fault diagnosis. Each of the four areas is categorized in terms of the AI techniques used: genetic algorithms, case-based reasoning, knowledge-based systems, fuzzy logic and hybrid techniques. The trends over the last decade are identified, discussed with respect to expected trends and directions for future work suggested
Intelligent systems in manufacturing: current developments and future prospects
Global competition and rapidly changing customer requirements are demanding increasing changes in manufacturing environments. Enterprises are required to constantly redesign their products and continuously reconfigure their manufacturing systems. Traditional approaches to manufacturing systems do not fully satisfy this new situation. Many authors have proposed that artificial intelligence will bring the flexibility and efficiency needed by manufacturing systems. This paper is a review of artificial intelligence techniques used in manufacturing systems. The paper first defines the components of a simplified intelligent manufacturing systems (IMS), the different Artificial Intelligence (AI) techniques to be considered and then shows how these AI techniques are used for the components of IMS
Single machine scheduling problems with uncertain parameters and the OWA criterion
In this paper a class of single machine scheduling problems is discussed. It
is assumed that job parameters, such as processing times, due dates, or weights
are uncertain and their values are specified in the form of a discrete scenario
set. The Ordered Weighted Averaging (OWA) aggregation operator is used to
choose an optimal schedule. The OWA operator generalizes traditional criteria
in decision making under uncertainty, such as the maximum, average, median or
Hurwicz criterion. It also allows us to extend the robust approach to
scheduling by taking into account various attitudes of decision makers towards
the risk. In this paper a general framework for solving single machine
scheduling problems with the OWA criterion is proposed and some positive and
negative computational results for two basic single machine scheduling problems
are provided
A hybrid CFGTSA based approach for scheduling problem: a case study of an automobile industry
In the global competitive world swift, reliable and cost effective production subject to uncertain situations, through an appropriate management of the available resources, has turned out to be the necessity for surviving in the market. This inspired the development of the more efficient and robust methods to counteract the existing complexities prevailing in the market. The present paper proposes a hybrid CFGTSA algorithm inheriting the salient features of GA, TS, SA, and chaotic theory to solve the complex scheduling problems commonly faced by most of the manufacturing industries. The proposed CFGTSA algorithm has been tested on a scheduling problem of an automobile industry, and its efficacy has been shown by comparing the results with GA, SA, TS, GTS, and hybrid TSA algorithms
Solving no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines and rework time by the adjusted discrete Multi Objective Invasive Weed Optimization and fuzzy dominance approach
Purpose: Adjusted discrete Multi-Objective Invasive Weed Optimization (DMOIWO) algorithm, which uses fuzzy dominant approach for ordering, has been proposed to solve No-wait two-stage flexible flow shop scheduling problem.
Design/methodology/approach: No-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times and probable rework in both stations, different ready times for all jobs and rework times for both stations as well as unrelated parallel machines with regards to the simultaneous minimization of maximum job completion time and average latency functions have been investigated in a multi-objective manner. In this study, the parameter setting has been carried out using Taguchi Method based on the quality indicator for beater performance of the algorithm.
Findings: The results of this algorithm have been compared with those of conventional, multi-objective algorithms to show the better performance of the proposed algorithm. The results clearly indicated the greater performance of the proposed algorithm.
Originality/value: This study provides an efficient method for solving multi objective no-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times, probable rework in both stations, different ready times for all jobs, rework times for both stations and unrelated parallel machines which are the real constraints.Peer Reviewe
Elastic Business Process Management: State of the Art and Open Challenges for BPM in the Cloud
With the advent of cloud computing, organizations are nowadays able to react
rapidly to changing demands for computational resources. Not only individual
applications can be hosted on virtual cloud infrastructures, but also complete
business processes. This allows the realization of so-called elastic processes,
i.e., processes which are carried out using elastic cloud resources. Despite
the manifold benefits of elastic processes, there is still a lack of solutions
supporting them.
In this paper, we identify the state of the art of elastic Business Process
Management with a focus on infrastructural challenges. We conceptualize an
architecture for an elastic Business Process Management System and discuss
existing work on scheduling, resource allocation, monitoring, decentralized
coordination, and state management for elastic processes. Furthermore, we
present two representative elastic Business Process Management Systems which
are intended to counter these challenges. Based on our findings, we identify
open issues and outline possible research directions for the realization of
elastic processes and elastic Business Process Management.Comment: Please cite as: S. Schulte, C. Janiesch, S. Venugopal, I. Weber, and
P. Hoenisch (2015). Elastic Business Process Management: State of the Art and
Open Challenges for BPM in the Cloud. Future Generation Computer Systems,
Volume NN, Number N, NN-NN., http://dx.doi.org/10.1016/j.future.2014.09.00
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques
- …