Computer-Aided System for Wind Turbine Data Analysis
Context: The current work on wind turbine failure detection focuses on researching suitable signal processing algorithms and developing efficient diagnosis algorithms. The laboratory research would involve large and complex data, and it can be a daunting task.
Aims: To develop a Computer-Aided system for assisting experts to conduct an efficient laboratory research on wind turbine data analysis. System is expected to provide data visualization, data manipulation, massive data processing and wind turbine failure detection.
Method: 50G off-line SCADA data and 4 confident diagnosis algorithms were used in this project. Apart from the instructions from supervisor, this project also gained help from two experts from Engineering Department. Java and Microsoft SQL database were used to develop the system.
Results: Data visualization provided 6 different charting solutions and together with robust user interactions. 4 failure diagnosis solutions and data manipulations were provided in the system. In addition, dedicated database server and Matlab API with Java RMI were used to resolve the massive data processing problem.
Conclusions: Almost all of the deliverables were completed. Friendly GUI and useful functionalities make user feel more comfortable. The final product does enable experts to conduct an efficient laboratory research. The end of this project also gave some potential extensions of the system
Identifying smart design attributes for Industry 4.0 customization using a clustering Genetic Algorithm
Industry 4.0 aims at achieving mass customization at a
mass production cost. A key component to realizing this is accurate
prediction of customer needs and wants, which is however a
challenging issue due to the lack of smart analytics tools. This
paper investigates this issue in depth and then develops a predictive
analytic framework for integrating cloud computing, big data
analysis, business informatics, communication technologies, and
digital industrial production systems. Computational intelligence
in the form of a cluster k-means approach is used to manage
relevant big data for feeding potential customer needs and wants
to smart designs for targeted productivity and customized mass
production. The identification of patterns from big data is achieved
with cluster k-means and with the selection of optimal attributes
using genetic algorithms. A car customization case study shows
how it may be applied and where to assign new clusters with
growing knowledge of customer needs and wants. This approach
offer a number of features suitable to smart design in realizing
Industry 4.0
Review and Comparison of Intelligent Optimization Modelling Techniques for Energy Forecasting and Condition-Based Maintenance in PV Plants
Within the field of soft computing, intelligent optimization modelling techniques include
various major techniques in artificial intelligence. These techniques pretend to generate new business
knowledge transforming sets of "raw data" into business value. One of the principal applications of
these techniques is related to the design of predictive analytics for the improvement of advanced
CBM (condition-based maintenance) strategies and energy production forecasting. These advanced
techniques can be used to transform control system data, operational data and maintenance event data
to failure diagnostic and prognostic knowledge and, ultimately, to derive expected energy generation.
One of the systems where these techniques can be applied with massive potential impact are the
legacy monitoring systems existing in solar PV energy generation plants. These systems produce a
great amount of data over time, while at the same time they demand an important e ort in order to
increase their performance through the use of more accurate predictive analytics to reduce production
losses having a direct impact on ROI. How to choose the most suitable techniques to apply is one of
the problems to address. This paper presents a review and a comparative analysis of six intelligent
optimization modelling techniques, which have been applied on a PV plant case study, using the
energy production forecast as the decision variable. The methodology proposed not only pretends
to elicit the most accurate solution but also validates the results, in comparison with the di erent
outputs for the di erent techniques
Bounding inconsistency using a novel threshold metric for dead reckoning update packet generation
Human-to-human interaction across distributed applications requires that sufficient consistency be maintained among participants in the face of network characteristics such as latency and limited bandwidth. The level of inconsistency arising from the network is proportional to the network delay, and thus a function of bandwidth consumption. Distributed simulation has often used a bandwidth reduction technique known as dead reckoning that combines approximation and estimation in the communication of entity movement to reduce network traffic, and thus improve consistency. However, unless carefully tuned to application and network characteristics, such an approach can introduce more inconsistency than it avoids. The key tuning metric is the distance threshold. This paper questions the suitability of the standard distance threshold as a metric for use in the dead reckoning scheme. Using a model relating entity path curvature and inconsistency, a major performance related limitation of the distance threshold technique is highlighted. We then propose an alternative time—space threshold criterion. The time—space threshold is demonstrated, through simulation, to perform better for low curvature movement. However, it too has a limitation. Based on this, we further propose a novel hybrid scheme. Through simulation and live trials, this scheme is shown to perform well across a range of curvature values, and places bounds on both the spatial and absolute inconsistency arising from dead reckoning
Recommended from our members
Cooling load forecasting-based predictive optimisation for chiller plants
Extensive electric power is required to maintain indoor thermal comfort using heating, ventilation and air conditioning (HVAC) systems, of which, water-cooled chiller plants consume more than 50% of the total electric power. To improve energy efficiency, supervisory optimisation control can be adopted. The controlled variables are usually optimised according to instant building cooling load and ambient wet bulb air temperature at regular time intervals. In this way, the energy efficiency of chiller plants has been improved. However, with an inherent assumption that the instant building cooling load and ambient wet bulb temperature remain constant in the coming time interval, the energy efficiency potential has not been fully realised, especially when cooling loads vary suddenly and extremely. To solve this problem, a cooling load forecasting-based predictive optimisation method is proposed. Instead of minimising the instant system power according to the instant building cooling load and ambient wet bulb temperature, the controlled variables are derived to minimise the sum of the instant system power and one-time-step-ahead future system power according to both instant and forecasted future building cooling loads. With this method, the energy efficiency potential of a chiller plant can be further improved without shortening the operation time interval. 80% redundant energy consumption has been reduced for the sample chiller plant; energy can be saved for chiller plants that work for years. The evaluation on the effect of cooling load forecasting accuracy turns out that the more accurate the forecasts are, the more redundant energy consumption can be reduced
Artificial intelligence for throughput bottleneck analysis – State-of-the-art and future directions
Identifying, and eventually eliminating throughput bottlenecks, is a key means to increase throughput and productivity in production systems. In the real world, however, eliminating throughput bottlenecks is a challenge. This is due to the landscape of complex factory dynamics, with several hundred machines operating at any given time. Academic researchers have tried to develop tools to help identify and eliminate throughput bottlenecks. Historically, research efforts have focused on developing analytical and discrete event simulation modelling approaches to identify throughput bottlenecks in production systems. However, with the rise of industrial digitalisation and artificial intelligence (AI), academic researchers explored different ways in which AI might be used to eliminate throughput bottlenecks, based on the vast amounts of digital shop floor data. By conducting a systematic literature review, this paper aims to present state-of-the-art research efforts into the use of AI for throughput bottleneck analysis. To make the work of the academic AI solutions more accessible to practitioners, the research efforts are classified into four categories: (1) identify, (2) diagnose, (3) predict and (4) prescribe. This was inspired by real-world throughput bottleneck management practice. The categories, identify and diagnose focus on analysing historical throughput bottlenecks, whereas predict and prescribe focus on analysing future throughput bottlenecks. This paper also provides future research topics and practical recommendations which may help to further push the boundaries of the theoretical and practical use of AI in throughput bottleneck analysis
Advanced Techniques for Assets Maintenance Management
16th IFAC Symposium on Information Control Problems in Manufacturing INCOM 2018
Bergamo, Italy, 11–13 June 2018. Edited by Marco Macchi, László Monostori, Roberto PintoThe aim of this paper is to remark the importance of new and advanced techniques supporting decision making in different business processes for maintenance and assets management, as well as the basic need of adopting a certain management framework with a clear processes map and the corresponding IT supporting systems. Framework processes and systems will be the key fundamental enablers for success and for continuous improvement. The suggested framework will help to define and improve business policies and work procedures for the assets operation and maintenance along their life cycle. The following sections present some achievements on this focus, proposing finally possible future lines for a research agenda within this field of assets management
Multiscale Machine Learning and Numerical Investigation of Ageing in Infrastructures
Infrastructure is a critical component of a country’s economic growth. Interaction with extreme service environments can adversely affect the long-term performance of infrastructure and accelerate ageing. This research focuses on using machine learning to improve the efficiency of analysing the multiscale ageing impact on infrastructure.
First, a data-driven campaign is developed to analyse the condition of an ageing infrastructure. A machine learning-based framework is proposed to predict the state of various assets across a railway system.
The ageing of the bond in fibre-reinforced polymer (FRP)-strengthened concrete elements is investigated using machine learning. Different machine learning models are developed to characterise the long-term performance of the bond.
The environmental ageing of composite materials is investigated by a micromechanics-based machine learning model. A mathematical framework is developed to automatically generate microstructures. The microstructures are analysed by the finite element (FE) method. The generated data is used to develop a machine learning model to study the degradation of the transverse performance of composites under humid conditions.
Finally, a multiscale FE and machine learning framework is developed to expand the understanding of composite material ageing. A moisture diffusion analysis is performed to simulate the water uptake of composites under water immersion conditions. The results are downscaled to obtain micromodel stress fields. Numerical homogenisation is used to obtain the composite transverse behaviour. A machine learning model is developed based on the multiscale simulation results to model the ageing process of composites under water immersion.
The frameworks developed in this thesis demonstrate how machine learning improves the analysis of ageing across multiple scales of infrastructure. The resulting understanding can help develop more efficient strategies for the rehabilitation of ageing infrastructure
- …