6,323 research outputs found

    Launch Vehicle Operations Simulator

    Get PDF
    The Saturn Launch Vehicle Operations Simulator (LVOS) was developed for NASA at Kennedy Space Center. LVOS simulates the Saturn launch vehicle and its ground support equipment. The simulator was intended primarily to be used as a launch crew trainer but it is also being used for test procedure and software validation. A NASA/contractor team of engineers and programmers implemented the simulator after the Apollo XI lunar landing during the low activity periods between launches

    STS-6 sixth Space Shuttle mission. First flight of the Challenger

    Get PDF
    A prelaunch summary of the sixth Space Shuttle mission is provided. The Challenger orbiter; launching; uprated engines; lighter weight boosters; lightweight tank; external tank reduction; landing; the tracking and data relay satellite system (TDRSS), TDRS-1 deployment; the inertial upper stage (IUS), the spacewalk;electrophoresis, monodisperse latex reactor, night time/day time optical survey of lightning, and getaway special experiments are described

    Columbia's first flight shakes down space transportation system

    Get PDF
    The first space shuttle mission is described. Topics include launch preparations, flight profile, trajectory, and landing operations. The spaceflight tracking and data network is discussed and the photography and television schedules are included

    NASA

    Get PDF

    Wet countdown demonstration and flight readiness firing

    Get PDF
    The prelaunch tests for the Space Transportation System 1 flight are briefly described. Testing is divided into two major sections: the wet countdown demonstration test/flight readiness firing, which includes a 20 second test firing of the orbiter's three main engines, and a mission verification test, which is centered on flight and landing operations. The functions of the countdown sequence are listed and end of mission and mission abort exercises are described

    Highlights of 1981 activities

    Get PDF
    The highlights of NASA's 1981 activities are presented, including the results of the two flights of the space shuttle Columbia and the Voyager 2 encounter with Saturn. Accomplishments in the areas of space transportation operations; space science; aeronautical, energy, and space research and development; as well as space tracking, international activities, and 1981 launch activities are discussed

    The writers guide to NASA

    Get PDF
    NASA services of interest to writers and to the news media include personal interviews, daily audio reports of major missions, and projects via automated telephone, research assistance from historians or history monitors at technical libraries, the use of a collection of historical photographs, and the free loan of sound films of NASA research and development activities. The names and phones numbers are listed for public affairs contacts at Headquarters and at each of the major centers and their component installations. An overview of the six NASA program offices is included along with a vicinity map of each center and a description of their facilities and management responsibilities

    Operational concepts for selected Sortie missions: Executive summary

    Get PDF
    An executive summary is presented of a Spacelab concept study conducted from August 1973 to June 1974. Background information and a summary of study conclusions are given. Specific data are reported for the quick-reaction carrier concept, software and mission integration, configuration management, documentation, equipment pool, and integration alternatives. A forecast of the impact of a second launch site, mission feasibility, and space availability for the Spacelab are also discussed

    Advancing automation and robotics technology for the space station and for the US economy: Submitted to the United States Congress October 1, 1987

    Get PDF
    In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the space station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the Law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the fifth in a series of progress updates and covers the period between 16 May 1987 and 30 September 1987. NASA has accepted the basic recommendations of ATAC for its space station efforts. ATAC and NASA agree that the mandate of Congress is that an advanced automation and robotics technology be built to support an evolutionary space station program and serve as a highly visible stimulator affecting the long-term U.S. economy
    corecore