A survey of variants and extensions of the resource-constrained project scheduling problem
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rather basic model with assumptions that are too restrictive for many practical applications. Consequently, various extensions of the basic RCPSP have been developed. This paper gives an overview over these extensions. The extensions are classified according to the structure of the RCPSP. We summarize generalizations of the activity concept, of the precedence relations and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. In addition to popular variants and extensions such as multiple modes, minimal and maximal time lags, and net present value-based objectives, the paper also provides a survey of many less known concepts. --project scheduling,modeling,resource constraints,temporal constraints,networks
Flow shop scheduling with earliness, tardiness and intermediate inventory holding costs
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two di erent, but closely related, Dantzig-Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig-Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two di erent lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near-optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with di erent types of strongly NP-hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near-optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs
A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem
In this paper, we study the job shop scheduling problem with the objective of minimizing the total weighted tardiness. We propose a hybrid shifting bottleneck - tabu search (SB-TS) algorithm by replacing the reoptimization step in the shifting bottleneck (SB) algorithm by a tabu search (TS). In terms of the shifting bottleneck heuristic, the proposed tabu search optimizes the total weighted tardiness for partial schedules in which some machines are currently assumed to have infinite capacity. In the context of tabu search, the shifting bottleneck heuristic features a long-term memory which helps to diversify the local search. We exploit this synergy to develop a state-of-the-art algorithm for the job shop total weighted tardiness problem (JS-TWT). The computational
effectiveness of the algorithm is demonstrated on standard benchmark instances from the literature
Models and Strategies for Variants of the Job Shop Scheduling Problem
Recently, a variety of constraint programming and Boolean satisfiability
approaches to scheduling problems have been introduced. They have in common the
use of relatively simple propagation mechanisms and an adaptive way to focus on
the most constrained part of the problem. In some cases, these methods compare
favorably to more classical constraint programming methods relying on
propagation algorithms for global unary or cumulative resource constraints and
dedicated search heuristics. In particular, we described an approach that
combines restarting, with a generic adaptive heuristic and solution guided
branching on a simple model based on a decomposition of disjunctive
constraints. In this paper, we introduce an adaptation of this technique for an
important subclass of job shop scheduling problems (JSPs), where the objective
function involves minimization of earliness/tardiness costs. We further show
that our technique can be improved by adding domain specific information for
one variant of the JSP (involving time lag constraints). In particular we
introduce a dedicated greedy heuristic, and an improved model for the case
where the maximal time lag is 0 (also referred to as no-wait JSPs).Comment: Principles and Practice of Constraint Programming - CP 2011, Perugia
: Italy (2011
Minimizing weighted total earliness, total tardiness and setup costs
The paper considers a (static) portfolio system that satisfies adding-up contraints and the gross substitution theorem. The paper shows the relationship of the two conditions to the weak dominant diagonal property of the matrix of interest rate elasticities. This enables to investigate the impact of simultaneous changes in interest rates on the asset demands.
How the structure of precedence constraints may change the complexity class of scheduling problems
This survey aims at demonstrating that the structure of precedence
constraints plays a tremendous role on the complexity of scheduling problems.
Indeed many problems can be NP-hard when considering general precedence
constraints, while they become polynomially solvable for particular precedence
constraints. We also show that there still are many very exciting challenges in
this research area
Single machine scheduling problems with uncertain parameters and the OWA criterion
In this paper a class of single machine scheduling problems is discussed. It
is assumed that job parameters, such as processing times, due dates, or weights
are uncertain and their values are specified in the form of a discrete scenario
set. The Ordered Weighted Averaging (OWA) aggregation operator is used to
choose an optimal schedule. The OWA operator generalizes traditional criteria
in decision making under uncertainty, such as the maximum, average, median or
Hurwicz criterion. It also allows us to extend the robust approach to
scheduling by taking into account various attitudes of decision makers towards
the risk. In this paper a general framework for solving single machine
scheduling problems with the OWA criterion is proposed and some positive and
negative computational results for two basic single machine scheduling problems
are provided
Parameterized complexity of machine scheduling: 15 open problems
Machine scheduling problems are a long-time key domain of algorithms and
complexity research. A novel approach to machine scheduling problems are
fixed-parameter algorithms. To stimulate this thriving research direction, we
propose 15 open questions in this area whose resolution we expect to lead to
the discovery of new approaches and techniques both in scheduling and
parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc
- …