485,099 research outputs found
Recommended from our members
Knowledge Cartography: Software tools and mapping techniques
Knowledge Cartography is the discipline of mapping intellectual landscapes.The focus of this book is on the process by which manually crafting interactive, hypertextual maps clarifies one’s own understanding, as well as communicating it.The authors see mapping software as a set of visual tools for reading and writing in a networked age. In an information ocean, the primary challenge is to find meaningful patterns around which we can weave plausible narratives. Maps of concepts, discussions and arguments make the connections between ideas tangible and disputable.
With 17 chapters from the leading researchers and practitioners, the reader will find the current state–of-the-art in the field. Part 1 focuses on educational applications in schools and universities, before Part 2 turns to applications in professional communitie
Competency-driven benefits realization model for minimization of post-contract transaction costs in design-build (d&b) delivery systems
The construction industry has been struggling with the issue of inconsistent performance with respect to cost of projects, completion time and the delivery of a quality product. In an attempt to address this issue the Design-Build (D&B) project delivery system was initiated primarily to overcome the shortcomings of the traditional procurement strategies. Although, traditionally D&B delivery system was aimed to greatly enhance client‘s benefits, this has not significantly been achieved. It lacks clear benefits realization management process to deliver the planned client‘s benefits. In particular, the Transaction Costs (TCs) incurred at the post-contract phase (PTCs) through D&B system has been the subject of criticism, wherein it has been unable to achieve the expected resounding success of a total shift away from the issues attributed to the traditional systems. This research aims to establish the importance of leveraging on D&B project team-competency and commitment structured within a strategic Benefits Realization Management framework to optimize client‘s benefits in terms of minimizing PTCs. The focus is on the aspect of competencies of key project participants and their project team commitment with respect to minimizing TCs that is structured within a Benefits Realization Management (BRM) practice. Questionnaire survey data was obtained from 231 respondents out of 357 administered questionnaires to G7 contractors registered under CIDB Malaysia that was based on a systematic sampling of the existing CIDB contractor database. The partial least squares structural equation modeling (PLS-SEM) technique was used to test the relationships being hypothesized and to validate and confirm the developed Competency Driven Benefits Realization Model (CD-BREM). Exploratory preliminary research findings reveal that post-contract TCs for D&B projects range from 3.5% to 13.5% of the project value. The primary research findings reveal that D&B team commitment has partial mediating effect between team competency and post-contract TCs. Whilst, BRM was found to have a partial mediating effect between team competency and post-contract TCs and no moderating effect as initially hypothesized. In general the research findings indicate that team competency, commitment and BRM have significant positive influences on post-contract TCs. This research provides a multi-dimensional perspective of the D&B project benefits realization concept and has the potential to address the issue of minimizing PTCs, which is seen as a social waste of wealth. Using CD-BREM it is possible to identify key human factors that can contribute to high project performance that also serves as an enabling mechanism for realizing the full potential of the D&B method for delivering successful projects. This research is timely to help reverse the trend of poor performance within the construction industry as a whole. Further work on the implementation of this CD-BREM model on construction projects and the consideration of including additional independent variables in the research theoretical framework can be explored to strengthen the credibility of the outcome of this research which is aimed at minimizing PTCs
Evaluating the quality of project planning: a model and field results
Faulty planning will result in project failure, whereas high-quality project planning increases the project's chances of success. The paper reports on the successful development and implementation of a model aimed at evaluating the quality of project planning. The model is based on both the abilities required of the project manager and the organizational support required for a proper project management infrastructure. The model was validated and applied by 282 project managers in nine organizations, where strong and weak planning processes were identified and analysed
Becoming the Gothic Archive: From Digital Collection to Digital Humanities
The Gothic Archive is the flagship digital humanities project for the Marquette University library. The project was birthed from a simple digital collection, and through the partnership of faculty and librarians, was transformed into something more. The core tenets of digital collection creation were adhered to in order to create a solid foundation upon which to build the Archive. The expertise of both groups and communication were key in the evolution of the collection, and in discovering and highlighting the relationships between the objects. This case study reviews the steps Marquette took in creating the collection and taking it to the level of digital humanities project
An agile business process and practice meta-model
Business Process Management (BPM) encompasses the discovery, modelling, monitoring, analysis and improvement of business processes. Limitations of traditional BPM approaches in addressing changes in business requirements have resulted in a number of agile BPM approaches that seek to accelerate the redesign of business process models. Meta-models are a key BPM feature that reduce the ambiguity of business process models. This paper describes a meta-model supporting the agile version of the Business Process and Practice Alignment Methodology (BPPAM) for business process improvement, which captures process information from actual work practices. The ability of the meta-model to achieve business process agility is discussed and compared with other agile meta-models, based on definitions of business process flexibility and agility found in the literature. (C) 2017 The Authors. Published by Elsevier B.V
Simplifying the Development, Use and Sustainability of HPC Software
Developing software to undertake complex, compute-intensive scientific
processes requires a challenging combination of both specialist domain
knowledge and software development skills to convert this knowledge into
efficient code. As computational platforms become increasingly heterogeneous
and newer types of platform such as Infrastructure-as-a-Service (IaaS) cloud
computing become more widely accepted for HPC computations, scientists require
more support from computer scientists and resource providers to develop
efficient code and make optimal use of the resources available to them. As part
of the libhpc stage 1 and 2 projects we are developing a framework to provide a
richer means of job specification and efficient execution of complex scientific
software on heterogeneous infrastructure. The use of such frameworks has
implications for the sustainability of scientific software. In this paper we
set out our developing understanding of these challenges based on work carried
out in the libhpc project.Comment: 4 page position paper, submission to WSSSPE13 worksho
EASTWEB: building an integrated leading Euro-Asian higher education and research community in the field of the Semantic WEB
Based on the experience of the EC funded project EASTWEB, a project involving Universities from Italy (main partner), Austria, Ireland, Poland, China, India and Thailand, we describe a set of on going and planned collaboration activities. We highlight what we see the major advantages but also the difficulties in carrying out such a program
- …