42,012 research outputs found

    Stochastic programming approaches to stochastic scheduling

    Full text link
    Practical scheduling problems typically require decisions without full information about the outcomes of those decisions. Yields, resource availability, performance, demand, costs, and revenues may all vary. Incorporating these quantities into stochastic scheduling models often produces diffculties in analysis that may be addressed in a variety of ways. In this paper, we present results based on stochastic programming approaches to the hierarchy of decisions in typical stochastic scheduling situations. Our unifying framework allows us to treat all aspects of a decision in a similar framework. We show how views from different levels enable approximations that can overcome nonconvexities and duality gaps that appear in deterministic formulations. In particular, we show that the stochastic program structure leads to a vanishing Lagrangian duality gap in stochastic integer programs as the number of scenarios increases.Peer Reviewedhttp://deepblue.lib.umich.edu/bitstream/2027.42/44935/1/10898_2004_Article_BF00121682.pd

    The Law of Sports. By John Weistart and Cym Lowell.

    Get PDF
    This report gives an overview of methods and approaches applicable to the UAV flight path and sensor aiming planning problem for search and track of multiple ground targets. The main focus of the survey is on stochastic optimal control, dynamic programming, partially observable Markov decision processes, sensor scheduling, bearings-only tracking, search and exploration. References to standard texts, as well as more recent research results, are given

    Using Information Filtering in Web Data Mining Process

    Get PDF
    Web service-oriented Grid is becoming a standard for achieving loosely coupled distributed computing. Grid services could easily be specified with web-service based interfaces. In this paper we first envisage a realistic Grid market with players such as end-users, brokers and service providers participating co-operatively with an aim to meet requirements and earn profit. End-users wish to use functionality of Grid services by paying the minimum possible price or price confined within a specified budget, brokers aim to maximise profit whilst establishing a SLA (Service Level Agreement) and satisfying end-user needs and at the same time resisting the volatility of service execution time and availability. Service providers aim to develop price models based on end-user or broker demands that will maximise their profit. In this paper we focus on developing stochastic approaches to end-user workflow scheduling that provides QoS guarantees by establishing a SLA. We also develop a novel 2-stage stochastic programming technique that aims at establishing a SLA with end-users regarding satisfying their workflow QoS requirements. We develop a scheduling (workload allocation) technique based on linear programming that embeds the negotiated workflow QoS into the program and model Grid services as generalised queues. This technique is shown to outperform existing scheduling techniques that don't rely on real-time performance information

    Stochastic Optimization for Network-Constrained Power System Scheduling Problem

    Get PDF
    The stochastic nature of demand and wind generation has a considerable effect on solving the scheduling problem of a modern power system. Network constraints such as power flow equations and transmission capacities also need to be considered for a comprehensive approach to model renewable energy integration and analyze generation system flexibility. Firstly, this paper accounts for the stochastic inputs in such a way that the uncertainties are modeled as normally distributed forecast errors. The forecast errors are then superimposed on the outputs of load and wind forecasting tools. Secondly, it efficiently models the network constraints and tests an iterative algorithm and a piecewise linear approximation for representing transmission losses in mixed integer linear programming (MILP). It also integrates load shedding according to priority factors set by the system operator. Moreover, the different interactions among stochastic programming, network constraints, and prioritized load shedding are thoroughly investigated in the paper. The stochastic model is tested on a power system adopted from Jeju Island, South Korea. Results demonstrate the impact of wind speed variability and network constraints on the flexibility of the generation system. Further analysis shows the effect of loss modeling approaches on total cost, accuracy, computational time, and memory requirement

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    A simheuristic algorithm for solving an integrated resource allocation and scheduling problem

    Get PDF
    Modern companies have to face challenging configuration issues in their manufacturing chains. One of these challenges is related to the integrated allocation and scheduling of resources such as machines, workers, energy, etc. These integrated optimization problems are difficult to solve, but they can be even more challenging when real-life uncertainty is considered. In this paper, we study an integrated allocation and scheduling optimization problem with stochastic processing times. A simheuristic algorithm is proposed in order to effectively solve this integrated and stochastic problem. Our approach relies on the hybridization of simulation with a metaheuristic to deal with the stochastic version of the allocation-scheduling problem. A series of numerical experiments contribute to illustrate the efficiency of our methodology as well as their potential applications in real-life enterprise settings
    corecore