31,490 research outputs found
Revisiting Size-Based Scheduling with Estimated Job Sizes
We study size-based schedulers, and focus on the impact of inaccurate job
size information on response time and fairness. Our intent is to revisit
previous results, which allude to performance degradation for even small errors
on job size estimates, thus limiting the applicability of size-based
schedulers.
We show that scheduling performance is tightly connected to workload
characteristics: in the absence of large skew in the job size distribution,
even extremely imprecise estimates suffice to outperform size-oblivious
disciplines. Instead, when job sizes are heavily skewed, known size-based
disciplines suffer.
In this context, we show -- for the first time -- the dichotomy of
over-estimation versus under-estimation. The former is, in general, less
problematic than the latter, as its effects are localized to individual jobs.
Instead, under-estimation leads to severe problems that may affect a large
number of jobs.
We present an approach to mitigate these problems: our technique requires no
complex modifications to original scheduling policies and performs very well.
To support our claim, we proceed with a simulation-based evaluation that covers
an unprecedented large parameter space, which takes into account a variety of
synthetic and real workloads.
As a consequence, we show that size-based scheduling is practical and
outperforms alternatives in a wide array of use-cases, even in presence of
inaccurate size information.Comment: To be published in the proceedings of IEEE MASCOTS 201
PSBS: Practical Size-Based Scheduling
Size-based schedulers have very desirable performance properties: optimal or
near-optimal response time can be coupled with strong fairness guarantees.
Despite this, such systems are very rarely implemented in practical settings,
because they require knowing a priori the amount of work needed to complete
jobs: this assumption is very difficult to satisfy in concrete systems. It is
definitely more likely to inform the system with an estimate of the job sizes,
but existing studies point to somewhat pessimistic results if existing
scheduler policies are used based on imprecise job size estimations. We take
the goal of designing scheduling policies that are explicitly designed to deal
with inexact job sizes: first, we show that existing size-based schedulers can
have bad performance with inexact job size information when job sizes are
heavily skewed; we show that this issue, and the pessimistic results shown in
the literature, are due to problematic behavior when large jobs are
underestimated. Once the problem is identified, it is possible to amend
existing size-based schedulers to solve the issue. We generalize FSP -- a fair
and efficient size-based scheduling policy -- in order to solve the problem
highlighted above; in addition, our solution deals with different job weights
(that can be assigned to a job independently from its size). We provide an
efficient implementation of the resulting protocol, which we call Practical
Size-Based Scheduler (PSBS). Through simulations evaluated on synthetic and
real workloads, we show that PSBS has near-optimal performance in a large
variety of cases with inaccurate size information, that it performs fairly and
it handles correctly job weights. We believe that this work shows that PSBS is
indeed pratical, and we maintain that it could inspire the design of schedulers
in a wide array of real-world use cases.Comment: arXiv admin note: substantial text overlap with arXiv:1403.599
Proactive Location-Based Scheduling of Delay-Constrained Traffic Over Fading Channels
In this paper, proactive resource allocation based on user location for
point-to-point communication over fading channels is introduced, whereby the
source must transmit a packet when the user requests it within a deadline of a
single time slot. We introduce a prediction model in which the source predicts
the request arrival slots ahead, where denotes the prediction
window (PW) size. The source allocates energy to transmit some bits proactively
for each time slot of the PW with the objective of reducing the transmission
energy over the non-predictive case. The requests are predicted based on the
user location utilizing the prior statistics about the user requests at each
location. We also assume that the prediction is not perfect. We propose
proactive scheduling policies to minimize the expected energy consumption
required to transmit the requested packets under two different assumptions on
the channel state information at the source. In the first scenario, offline
scheduling, we assume the channel states are known a-priori at the source at
the beginning of the PW. In the second scenario, online scheduling, it is
assumed that the source has causal knowledge of the channel state. Numerical
results are presented showing the gains achieved by using proactive scheduling
policies compared with classical (reactive) networks. Simulation results also
show that increasing the PW size leads to a significant reduction in the
consumed transmission energy even with imperfect prediction.Comment: Conference: VTC2016-Fall, At Montreal-Canad
Scheduling with Predictions and the Price of Misprediction
In many traditional job scheduling settings, it is assumed that one knows the time it will take for a job to complete service. In such cases, strategies such as shortest job first can be used to improve performance in terms of measures such as the average time a job waits in the system. We consider the setting where the service time is not known, but is predicted by for example a machine learning algorithm. Our main result is the derivation, under natural assumptions, of formulae for the performance of several strategies for queueing systems that use predictions for service times in order to schedule jobs. As part of our analysis, we suggest the framework of the "price of misprediction," which offers a measure of the cost of using predicted information
- …