9,558 research outputs found

    Bandit processes and dynamic allocation indices

    Get PDF

    Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems

    Get PDF
    Productivity;Production Scheduling;Manufacturing;production

    Inventory control in multi-item production systems

    Get PDF
    This thesis focusses on the analysis and construction of control policies in multiitem production systems. In such systems, multiple items can be made to stock, but they have to share the finite capacity of a single machine. This machine can only produce one unit at a time and if it is set-up for one item, a switch-over or set-up time is needed to start the production of another item. Customers arrive to the system according to (compound) Poisson processes and if they see no stock upon arrival, they are either considered as a lost sale or backlogged. In this thesis, we look at production systems with backlog and production systems with lost sales. In production systems with lost sales, all arriving customers are considered lost if no stock is available and penalty costs are paid per lost customer. In production systems with backlog, arriving customers form a queue if they see no stock and backlogging costs are paid for every backlogged customer per time unit. These production systems find many applications in industry, for instance glass and paper production or bulk production of beers, see Anupindi and Tayur [2]. The objective for the production manager is to minimize the sum of the holding and penalty or backlogging costs. At each decision moment, the manager has to decide whether to switch to another product type, to produce another unit of the type that is set-up or to idle the machine. In order to minimize the total costs, a balance must be found between a fast switching scheme that is able to react to sudden changes in demand and a production plan with a little loss of capacity. Unfortunately, a fast switching scheme results in a loss of capacity, because switching from one product type to another requires a switch-over or set-up time. In the optimal production strategy, decisions depend on the complete state of the system. Because the processes at the different product flows depend on these decisions, the processes also depend on the complete state of the system. This means that the processes at the different product flows are not independent, which makes the analysis and construction of the optimal production strategy very complex. In fact, the complexity of the determination of this policy grows exponentially in the number of product types and if this number is too large, the optimal policy becomes intractable. Production strategies in which decisions depend on the complete system are defined as global lot sizing policies and are often difficult to construct or analyse, because of the dependence between the different product flows. However, in this thesis the construction of a global lot sizing policy is presented which also works for production systems with a large number of product types. The key factor that makes the construction possible is the fact that it is based on a fixed cycle policy. In Chapter 2, the fixed cycle policy is analysed for production systems with lost sales and in Chapter 6, the fixed cycle policy is analysed for production systems with backlog. The fixed cycle policy can be analysed per product flow and this decomposition property allows for the determination of the so called relative values. If it is assumed that one continues with a fixed cycle control, the relative values per product type represent the relative expected future costs for each decision. Based on these relative values, an improvement step (see Norman [65]) is performed which results in a ‘one step improvement’ policy. This policy is constructed and analysed in Chapters 2 and 7 for production systems with lost sales and production systems with backlog, respectively. This global lot sizing policy turns out to perform well compared to other, heuristic production strategies, especially in systems with a high load and demand processes with a high variability. A similar approach as for the production system with a single machine is performed in a system with two machines and lost sales in Chapter 3. Results show that in some cases the constructed strategy works well, although in some systems two separate one step improvement policies perform better. Examples of more heuristic production strategies are gated and exhaustive basestock policies. In these ’local lot sizing‘ policies, decisions depend only on the stock level of the product type that is set-up. But even in these policies, the processes at the different product flows are dependent. This makes the analysis difficult, but for production systems with backlog a translation can be made to a queueing system by looking at the number of products short to the base-stock level. So the machine becomes a server and each product flow becomes a queue. In these queueing systems, also known as polling systems, gated and exhaustive base-stock policies become gated and exhaustive visit disciplines. For polling systems, an exact analysis of the queue length or waiting time distribution is often possible via generating functions or Laplace-Stieltjes transforms. In Chapter 5, the determination of the sojourn time distribution of customers in a polling system with a (globally) gated visit discipline is presented, which comes down to the determination of the lead time distribution in the corresponding production system

    COST-EFFICIENT RESOURCE PROVISIONING FOR CLOUD-ENABLED SCHEDULERS

    Get PDF
    Since the last decade, public cloud platforms are rapidly becoming de-facto computing platform for our society. To support the wide range of users and their diverse applications, public cloud platforms started to offer the same VMs under many purchasing options that differ across their cost, performance, availability, and time commitments. Popular purchasing options include on-demand, reserved, and transient VM types. Reserved VMs require long time commitments, whereas users can acquire and release the on-demand (and transient) VMs at any time. While transient VMs cost significantly less than on-demand VMs, platforms may revoke them at any time. In general, the stronger the commitment, i.e., longer and less flexible, the lower the price. However, longer and less flexible time commitments can increase cloud costs for users if future workloads cannot utilize the VMs they committed to buying. Interestingly, this wide range of purchasing options provide opportunities for cost savings. However, large cloud customers often find it challenging to choose the right mix of purchasing options to minimize their long-term costs while retaining the ability to adjust their capacity up and down in response to workload variations. Thus, optimizing the cloud costs requires users to select a mix of VM purchasing options based on their short- and long-term expectation of workload utilization. Notably, hybrid clouds combine multiple VM purchasing options or private clusters with public cloud VMs to optimize the cloud costs based on their workload expectations. In this thesis, we address the challenge of choosing a mix of different VM purchasing options in the context of large cloud customers and thereby optimizing their cloud costs. To this end, we make the following contributions: (i) design and implement a container orchestration platform (using Kubernetes) to optimize the cost of executing mixed interactive and batch workloads on cloud platforms using on-demand and transient VMs, (ii) develop simple analytical models for different straggler mitigation techniques to better understand the cost of synchronization in distributed machine learning workloads and compare their cost and performance on on-demand and transient VMs, (iii) design multiple policies to optimize long-term cloud costs by selecting a mix of VM purchasing options based on short- and long-term expectations of workload utilization (with no job waiting), (iv) introduce the concept of waiting policy for cloud-enabled schedulers, and show that provisioning long-term resources (e.g., reserved VMs) to optimize the cloud costs is dependent on it, and (v) design and implement speculative execution and ML-based waiting time predictions (for waiting policies) to show that optimizing job waiting in the cloud is possible without accurate job runtime predictions

    Tactical design of production-distribution networks : safety stocks, shipment consolidation and production planning

    Get PDF
    VII+217hlm.;24c

    Strategic marketing, production, and distribution planning of an integrated manufacturing system

    Get PDF
    Production Scheduling;Distribution;CIM;production

    A survey of the machine interference problem

    Get PDF
    This paper surveys the research published on the machine interference problem since the 1985 review by Stecke & Aronson. After introducing the basic model, we discuss the literature along several dimensions. We then note how research has evolved since the 1985 review, including a trend towards the modelling of stochastic (rather than deterministic) systems and the corresponding use of more advanced queuing methods for analysis. We conclude with some suggestions for areas holding particular promise for future studies.Natural Sciences and Engineering Research Council (NSERC) Discovery Grant 238294-200

    "Rotterdam econometrics": publications of the econometric institute 1956-2005

    Get PDF
    This paper contains a list of all publications over the period 1956-2005, as reported in the Rotterdam Econometric Institute Reprint series during 1957-2005.
    corecore