803 research outputs found

    A two-stage dynamic model on allocation of construction facilities with genetic algorithm

    Get PDF
    By their very nature, activities within the construction site are generally highly dynamic and complex. Hence, it is highly desirable to be able to formulate the optimal strategy for allocating site-level facilities at different times of the project. The principal objective is to minimize the total cost, which comprises the transportation, handling, capital, and operating costs at potential intermediate transfer centers of various plant and material resources over the entire project duration. The problem can be formulated as a mixed integer program, which entails enormous computational effort for the solution, in particular when the problem size is large. In this paper, a two-stage dynamic model is developed to assist construction planners to formulate the optimal strategy for establishing potential intermediate transfer centers for site-level facilities such as batch plants, lay-down yards, receiving warehouses, various workshops, etc. Under this approach, the solution of the problem is split into two stages, namely, a lower-level stage and an upper-level stage. The former can be solved by a standard linear programming method, whereas the latter is solved by a genetic algorithm. The efficiency of the proposed algorithm is demonstrated through case examples.Department of Civil and Environmental EngineeringAuthor name used in this publication: K. W. Cha

    Facility layout planning. An extended literature review

    Full text link
    [EN] Facility layout planning (FLP) involves a set of design problems related to the arrangement of the elements that shape industrial production systems in a physical space. The fact that they are considered one of the most important design decisions as part of business operation strategies, and their proven repercussion on production systems' operation costs, efficiency and productivity, mean that this theme has been widely addressed in science. In this context, the present article offers a scientific literature review about FLP from the operations management perspective. The 232 reviewed articles were classified as a large taxonomy based on type of problem, approach and planning stage and characteristics of production facilities by configuring the material handling system and methods to generate and assess layout alternatives. We stress that the generation of layout alternatives was done mainly using mathematical optimisation models, specifically discrete quadratic programming models for similar sized departments, or continuous linear and non-linear mixed integer programming models for different sized departments. Other approaches followed to generate layout alternatives were expert's knowledge and specialised software packages. Generally speaking, the most frequent solution algorithms were metaheuristics.The research leading to these results received funding from the European Union H2020 Program under grant agreement No 958205 `Industrial Data Services for Quality Control in Smart Manufacturing (i4Q)'and from the Spanish Ministry of Science, Innovation and Universities under grant agreement RTI2018-101344-B-I00 `Optimisation of zerodefectsproduction technologies enabling supply chains 4.0 (CADS4.0)'Pérez-Gosende, P.; Mula, J.; Díaz-Madroñero Boluda, FM. (2021). Facility layout planning. An extended literature review. International Journal of Production Research. 59(12):3777-3816. https://doi.org/10.1080/00207543.2021.189717637773816591

    Overview of Multi-Objective Optimization Approaches in Construction Project Management

    Get PDF
    The difficulties that are met in construction projects include budget issues, contractual time constraints, complying with sustainability rating systems, meeting local building codes, and achieving the desired quality level, to name but a few. Construction researchers have proposed and construction practitioners have used optimization strategies to meet various objectives over the years. They started out by optimizing one objective at a time (e.g., minimizing construction cost) while disregarding others. Because the objectives of construction projects often conflict with each other, single-objective optimization does not offer practical solutions as optimizing one objective would often adversely affect the other objectives that are not being optimized. They then experimented with multi-objective optimization. The many multi-objective optimization approaches that they used have their own advantages and drawbacks when used in some scenarios with different sets of objectives. In this chapter, a review is presented of 16 multi-objective optimization approaches used in 55 research studies performed in the construction industry and that were published in the period 2012–2016. The discussion highlights the strengths and weaknesses of these approaches when used in different scenarios
    • …