17,016 research outputs found
Development of an Extended Product Lifecycle Management through Service Oriented Architecture.
Organised by: Cranfield UniversityThe aim of this work is to define new business opportunities through the concept of Extended Product
Lifecycle Management (ExtPLM), analysing its potential implementation within a Service Oriented
Architecture. ExtPLM merges the concepts of Extended Product, Avatar and PLM. It aims at allowing a
closer interaction between enterprises and their customers, who are integrated in all phases of the life cycle,
creating new technical functionalities and services, improving both the practical (e.g. improving usage,
improving safety, allowing predictive maintenance) and the emotional side (e.g. extreme customization) of
the product.Mori Seiki – The Machine Tool Company; BAE Systems; S4T – Support Service Solutions: Strategy and Transitio
BIM and its impact upon project success outcomes from a Facilities Management perspective
The uptake of Building Information Modelling (BIM) has been increasing, but some of its promoted potential benefits have been slow to materialise. In particular, claims that BIM will revolutionise facilities management (FM) creating efficiencies in the whole-life of building operations have yet to be achieved on a wide scale, certainly in comparison to tangible progress made for the prior design and construction phases. To attempt to unravel the factors at play in the adoption of BIM during the operational phase, and in particular, understand if adoption by facilities managers (FMs) is lagging behind other disciplines, this study aims to understand if current BIM processes can ease the challenges in this area faced by facilities management project stakeholders. To do this, success from a facilities management viewpoint is considered and barriers to facilities management success are explored, with focused BIM use proposed as a solution to these barriers. Qualitative research was undertaken, using semi structured interviews to collect data from a non-probability sample of 7 project- and facilities- management practitioners. Key results from this study show that the main barrier to BIM adoption by facilities managers is software interoperability, with reports that facilities management systems are unable to easily import BIM data produced during the design and construction stages. Additionally, facilities managers were not treated as salient stakeholders by Project Managers, further negatively affecting facilities management project success outcomes. A µresistance to change was identified as another barrier, as facilities managers were sceptical of the ability of current BIMenabled systems promoted as being FM compatible to be able to replicate their existing Computer Aided Facility Management (CAFM) legacy software and its user required capabilities. The results of this study highlight that more work is needed to ensure that BIM benefits the end user, as there was no reported use of BIM data for dedicated facilities management purposes. Further investigation into the challenges of interoperability could add significant value to this developing research area.The uptake of Building Information Modelling (BIM) has been increasing, but some of its promoted potential benefits have been slow to materialise. In particular, claims that BIM will revolutionise facilities management (FM) creating efficiencies in the whole-life of building operations have yet to be achieved on a wide scale, certainly in comparison to tangible progress made for the prior design and construction phases. To attempt to unravel the factors at play in the adoption of BIM during the operational phase, and in particular, understand if adoption by facilities managers (FMs) is lagging behind other disciplines, this study aims to understand if current BIM processes can ease the challenges in this area faced by facilities management project stakeholders. To do this, success from a facilities management viewpoint is considered and barriers to facilities management success are explored, with focused BIM use proposed as a solution to these barriers. Qualitative research was undertaken, using semi structured interviews to collect data from a non-probability sample of 7 project- and facilities- management practitioners. Key results from this study show that the main barrier to BIM adoption by facilities managers is software interoperability, with reports that facilities management systems are unable to easily import BIM data produced during the design and construction stages. Additionally, facilities managers were not treated as salient stakeholders by Project Managers, further negatively affecting facilities management project success outcomes. A µresistance to change was identified as another barrier, as facilities managers were sceptical of the ability of current BIMenabled systems promoted as being FM compatible to be able to replicate their existing Computer Aided Facility Management (CAFM) legacy software and its user required capabilities. The results of this study highlight that more work is needed to ensure that BIM benefits the end user, as there was no reported use of BIM data for dedicated facilities management purposes. Further investigation into the challenges of interoperability could add significant value to this developing research area
Recommended from our members
Designing a consulting services architecture model
textDuring my years of experience in the technology industry, it has become obvious that standard processes and methodologies within the engineering discipline are at a mature state. The realization though is that software engineering specifically lags behind. Most software engineering methodologies that I have studied focus on the mission of software development. It is this realization and the need for structure that led me to review existing methodologies used within my company's software services organization. The definition of what a successful software services methodology entails is rather limited. This report will provide a history of existing software engineering methodologies that I have studied, describe an initial services method that was being developed within my organization, develop a new model that addresses previous shortcomings and identify additional components required to further define a strong software services-oriented delivery methodology.Electrical and Computer Engineerin
- …